Laserfiche WebLink
1) Getting clarification on any impacts to trees/vegetation from the proposed leach field <br />and submission of N loading calculation form. <br />2) If vegetation is going to be impacted, then mitigation is recommended. <br /> <br /> <br /> <br /> BOARD OF HEALTH: Septic upgrade triggers the need for full compliance with BOH <br />I/A Septic Systems Regulation. I/A septic plans to be reviewed upon submission to the <br />BOH. <br /> <br />Mr. Cook made a motion for a negative determination with the specific conditions: <br />1. Planting 4 trees to replace 2 removed trees <br />2. Compliance with lawn standards as per flood zone requirements <br />3. Submission of nitrogen loading calculations <br />4. On-site inspection after septic system installation. <br />5. Order of Conditions to be recorded with the Barnstable County Registry of Deed to <br />make legally binding for future homeowners. <br />Ms. Godfrey seconded the motion. No further discussion. <br /> ROLL CALL: Mr. Cook (Yes), Mr. Sahl (Yes), Ms. Godfrey (Yes), Ms. Thornbrugh <br />(Yes), Mr. Colombo (Yes). <br /> <br />The motion passed unanimously. <br /> <br />Documents provided: Shay Environmental; Request for Determination of Applicability; 08/07/24 “Plot Plan <br />of Proposed Septic System Upgrade” (2 sheets) <br /> <br />6:54 <br />NOI #43-3310 <br /> 137 Summersea Road, Charles A. Aggouras. Proposed conversion of carport to garage <br />with living space above, no increase in footprint. Representative: Marsh Matters <br />Environmental Mike Ball <br /> <br />*Commissioner Cook recuses himself from the hearing due to his part in the design for the new <br />construction. <br /> <br />Project Details <br /> The project involves converting a 17 x 20 carport into an enclosed garage with living <br />space above, maintaining the existing house as a 3-bedroom <br /> A hardscape walkway is proposed, and post-face-to approval is sought for stairs <br />added to a redecked structure without prior conservation approval <br /> There is also a request for post facto approval for a circular fire pit constructed <br />without proper permission. <br /> Mitigation measures were proposed, including 883 sqft of planting to compensate for <br />the additional structures and hardscapes <br /> <br />19 <br /> <br /> <br />