My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/22/2024 CONSERVATION COMMISSION Minutes
>
08/22/2024 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 9:18:54 AM
Creation date
3/13/2025 9:03:23 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
08/22/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Regulatory & Administrative Considerations <br /> A waiver for Regulation 25 was requested due to the garage’s new vertical walls in a <br />flood zone <br /> Discussion involved the rationale for expanding the living space, the interior <br />reconfiguration of the previously 3-bedroom house to maintain the same number of <br />bedrooms <br /> The project included measures for flood compliance, such as smart vents, and required a <br />nitrogen-reducing septic system <br /> <br />Discussion & Queries from Commissioners <br /> Commissioners raised questions about the nature of the changes inside the existing house, <br />materials for the proposed walkway, and the justification for the expansion within a flood <br />zone. <br /> The representative clarified aspects of the intended use and construction while advocating <br />for the reasonable improvements to the single-family home. <br /> <br />Environmental & Technical Evaluations <br /> The Assistant Agent provided an assessment noting the reduction in runoff on the <br />property, addressing past cedar tree infestation, and emphasized the importance of a <br />mitigation contract for new plants (3 years). <br /> The improvements of the property were acknowledged, and emphasis was placed on on <br />aligning with environmental standards, especially regarding nitrogen loading and flood <br />compliance <br /> <br />There are no public comments. <br /> <br />Agent Comments <br /> Proposed garage to occupy the same footprint as an existing carport. No removal of <br />existing native vegetation <br /> Garage will be flood zone compliant with flood vents. Waiver requests from Reg. 25 <br />provisions in the project narrative <br /> Mitigation proposed to offset the increase in structure within the flood zone <br /> N Loading calculations provided. Calculated N loading is below 19ppm, which meets <br />Reg. 30 standards <br /> Home is restricted to 3 bedrooms. No increase in bedrooms. The existing bedroom in the <br />main house is to be reconfigured to be 2 bedrooms with 3rd bedroom being above the <br />proposed garage. <br /> Agent recommends: <br />1. If the project is approved, staff recommends submission of a signed three-year <br />mitigation monitoring contract between the property owner and qualified landscaper, <br />horticultural or wetland professional before commencement of work <br /> <br /> BOARD OF HEALTH: Property restricted to three (3) bedrooms previously permitted <br />by BOH with existing I/A system capacity. Adding any habitable space that meets the <br />bedroom’s definition would be considered an increase in flow and require a septic <br />upgrade. Floorplans to be reviewed upon submission to the Building Dept. Setbacks from <br />20 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.