Laserfiche WebLink
o Chop Chaque Bog Restoration Local Comprehensive Plan <br /> Construction Bid Package: approximately 28 requests with no actual bids <br />yet. <br /> A pre-bid meeting occurred with 2 companies attending; questions arose <br />and were requested in writing. <br /> <br />o Herring Warden <br />o Harbor Management Committee <br /> <br />o Mashpee River Restoration <br /> Kick-off meeting was well attended with a focus on the conceptual <br />approach as it marks the beginning of the restoration process. <br /> Funding updates: discussion on NOAA grants and updates on potential <br />funding. The tribe is expected to receive significant funding to support the <br />Natural Resources Department and hire additional staff related to the river <br />restoration. <br /> The Native Land Conservancy provided input on ensuring native plantings <br />are sustainable and harvestable for the tribe. <br /> Aim to begin construction by late October or early November, contingent <br />on receiving bids. <br /> <br />o Upper Mashpee River Restoration <br />o Santuit Pond Fish Ladder – NRCS <br />o Guided Nature Tours – September Schedule <br /> <br />COMMUNICATION/CORRESPONDENCE <br /> <br />ADDITIONAL COMMENTS <br /> <br />PUBLIC HEARING <br /> <br />6:30 <br />NOI #43-3296 <br /> 53 Greenwood Road, Brian & Elizabeth Rutana, Trustees of the Brian & Elizabeth <br />Rutana Trust. Proposed raze of an existing single-family dwelling, construction and <br />maintenance of new single-family dwelling, new Title 5 MicroFast septic tank, and <br />appurtenances. Representative: Cape & Islands Engineering, Inc. (cont. 6/27) Mark Dibb <br /> <br />*Commissioner Cook recuses himself from the hearing due to his part in the design for the new <br />construction. <br /> <br />Project Overview <br /> The property is in a flood zone <br />4 <br /> <br /> <br />