Laserfiche WebLink
o Mitigation maintenance contract: submit a 2-year maintenance contract with a <br />certified professional <br />o East property line screening: replace mulch with evergreen shrubs for screening <br />o ACEC Delineation: accurately determine and map ACEC boundaries <br /> Mr. Sahl seconded. No further discussion. <br />Roll Call: <br /> Mr. Cook (Yes), Mr. Sahl (Yes), Ms. Godfrey (Yes), Ms. Thornbrugh (No), and Mr. <br />Colombo (Yes) <br />o The motion passes (4:1) <br />Additional Key Points: <br /> Permit Issuance: <br />o Building permits will not be issued until all listed conditions are met <br />o No work to commence without meeting all conditions <br /> Monitoring: <br />o Conditions to be monitored and approved by conservation staff <br />o Construction permits contingent upon fulfillment of all conditions <br /> <br />Documents provided: Notice of intent application and project narrative; August 29, 2024, Plot Plan – Existing <br />Conditions (3 Sheets) <br /> <br />6:33 <br />RDA <br /> 14 Tulip Shell Way, Michael George; Representative: Cape & Islands Engineering, Inc. <br />Raul Lizardi-Rivera <br /> <br />*Mr. Cook Recused* <br /> <br />Project Overview: <br /> The applicant seeks a permit to file with Chapter 91 at DEP Waterways for a new license. <br /> No changes or work are proposed for the pier <br />Discussion Point: <br /> Confirmation that no work is proposed, only an extension of the existing license <br /> The recorded plan includes 2 floats with dimensions noted, which comply with <br />Regulation 27 and have existed for over 30 years. <br /> A 4ft wide access path with white gravel is noted, ensuring no encroachment into <br />vegetated areas <br />Public and Agent Comments: <br /> None <br /> <br /> HARBORMASTER: Does not pose any navigational hazards or abutting concerns. <br /> <br />Motion: <br />8 <br /> <br /> <br />