Laserfiche WebLink
 No increase in bedrooms or living space <br /> Areas altered from proposed SAS to be revegetated to existing conditions (removal of <br />English Ivy) <br /> Nitrogen loading calculations provided: 1.4 ppm (threshold under Reg.30 is 19 ppm) <br /> <br /> <br /> Board of Health: Septic upgrade triggers the need for full compliance with BOH I/A <br />Septic Systems Regulation. Proposed septic plans to be reviewed upon submission to <br />BOH. A potable drinking services the dwelling well and is subject to a nitrogen loading <br />limitation of 440 gallons/day/acre (1 bdrm/10,000 sq ft). Assessor’s field card shows lot <br />is 2.5 acres. <br /> <br />MOTION <br /> Mr. Cook motioned for a negative determination with the condition that the holly tree be <br />replaced in a similar location, gravel be added to cut driveway sections, and a drain for <br />stormwater be added. <br /> Ms. Zollo seconded the motion <br /> ROLL CALL: Ms. Zollo (Yes), Mr. Cook (Yes), Mr. Sahl (Yes), Ms. Thornbrugh (Yes), <br />Ms. Godfrey (Yes), Mr. Colombo (Yes). <br />The motion passes unanimously. <br /> <br />Documents provided: Geo-Cape Environmental Consultants; Request for Determination of Applicability application <br />& narrative; 09/21/2024 Proposed Septic System Repair <br /> <br />6:45 <br />NOI #43-3318 <br /> 24 Popponesset Island Road, 260 Heath Street Realty Trust <br />Representative: Chuck Rowland <br /> <br />Proposed Project <br /> Proposed reconstruction of existing timber pile driven pier and installation of ramp floats <br /> Pier licensed under 3079 <br /> Existing pier shows evidence of deterioration <br /> New pier supported by 26, 10 inch wide timber posts at same location <br /> Work to be done from barge or by hand within 4 hour time span around high tide <br />Environmental Considerations <br /> Agent recommends consistent 4ft width from beginning to float <br /> Through-flow decking requested for light penetration <br /> DNR wants to continue seeding under and around dock area for shellfish <br /> Sarah requests Division of Marine Fisheries comments <br /> Consideration of compensatory plantings for mitigation <br /> Discussion on float size exceeding 200 square feet limit (proposed 360 square feet) <br />Documentation and Compliance <br /> Request for copy of Chapter 91 license showing 360 square feet float approval <br />10 <br /> <br /> <br />