My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/10/2024 CONSERVATION COMMISSION Minutes
>
10/10/2024 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 9:08:22 AM
Creation date
3/13/2025 9:08:20 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
10/10/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6:30 <br />AOOC #43-3024 <br /> 1 Mute Swan Circle, John W. Cuming, Trustee, The Cuming Family GST Non- <br />Exempt Trust <br />Representatives: Mathew Eddy, Attorney Tyler Franklin and Brad Holmes <br /> <br />Project Overview and Changes <br /> Proposed new construction of single-family dwelling <br /> Project includes porches, deck, hardscaping, landscaping, utilities <br /> House footprint reduced and shifted away from 50ft buffer <br /> Retaining wall relocated <br /> Closest point of building now 5ft from 50ft buffer <br /> Two wall sections added to detail sheet <br />o One section illustrates the foundation of the house <br />o Second shows between the retaining wall and the house <br /> Driveway to be made of pervious material <br /> Wildlife habitat evaluation conducted by Brad Holmes <br />Environmental Considerations <br /> Lot described as mature forested with large trees <br /> Wildlife habitat evaluation found no significant habitat issues <br /> Lawn area well under 10% <br /> Clover mix suggested for lawn to reduce fertilizer use (no objection by applicant) <br /> Retaining wall construction and sewer line excavation discussed <br />Project Revisions and Conditions <br /> Weekly reports during retaining wall construction proposed <br /> Condition added for weekly reports throughout the entire construction phases <br /> Agreement to reduce from 5-bedroom to 4-bedroom house <br /> Concerns raised about alteration of vegetation in 50-100ft buffer <br /> Discussion on mitigation requirements for vegetation alteration <br />Additional Discussion <br /> Concerns raised about potential adverse effects on bank stability <br /> Clarification on clearing area and mitigation efforts (5900 sqft clearing area) <br /> Original mitigation included Phragmites removal and stormwater improvements <br /> Project designed to manage runoff through dry wells and pervious driveway <br />Agent Comments <br /> Proposed alterations outside the 50ft buffer to top of coastal bank. Preservation of 50 <br />naturally vegetated buffer strip. Vista pruning proposed through NVBS <br /> Work limit setback from 50ft buffer modified/increased <br /> Project locus is outside the 100 year floodplain but within the 100 (150)ft buffer zone <br /> <br /> Board of Health: Willowbend Wastewater Treatment Facility <br /> <br /> Building: The project does not require relief from ZBA <br /> <br />MOTION <br />4 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.