Laserfiche WebLink
<br /> Wastewater: There is no planned connection to the Mashpee Sanitary Sewer Collection <br />System. <br /> <br /> Building: The project is a substantial improvement within a flood zone. ZBA hearing <br />11/13. <br /> <br />MOTION <br /> Ms. Zollo motioned to close and issue with the condition of a signed two-year mitigation <br />contract. <br /> Mr. Sahl seconded the motion <br /> ROLL CALL: Rich (Yes), Alex (Yes), Ms. Godfrey (Yes), Mr. Cook (Yes) <br />The motion passes unanimously. <br /> <br />Documents provided: Cape and Island Engineering, Inc.; Notice of intent application and project narrative; <br />10/16/24 “Proposed site plan” <br /> <br />6:42 <br />NOI #43-3313 <br /> 24 Seconsett Point Road, Joshua, and Nicole Delman <br />Representative: Mark Dibb, Cape and Islands Engineering, Inc <br /> <br />Proposed Construction and Changes <br /> Previous hearing 9/26 and 10/10 <br /> House moved back and connected to the garage <br /> Garage doors now face Seconsett Point Road <br /> House reduced to four bedrooms; no Board of Health filing required <br /> Septic system adjusted, achieving 6.2 ft separation to groundwater <br /> Pier height increased to 6ft over BVW and saltmarsh <br /> All decking to be graded for light penetration <br /> Over 1800 sq ft area planned for restoration with native vegetation <br /> 21 flood vents to be installed in the lower level (200 sqft inch vents) <br />Environmental Concerns and Discussions <br /> The labeling of the ornamental landscape areas was questioned <br /> Discussed runoff management and grading plans <br /> The Chair highlighted the Division of Marine Fisheries letter regarding winter flounder <br />habitat <br /> Concerns raised about the 6-month window (January-May) for dock construction to <br />protect fish habitat <br /> Concerns raised about the cumulative effect of multiple docks on the river <br /> Discussed orientation of dock (east-west) and its impact on saltmarsh biomass <br /> Questions were raised about the amount of mulch being brought in <br />9 <br /> <br /> <br />