Laserfiche WebLink
o This is to keep the lawn at 10% <br />Project Evaluation and Deliberations <br /> Acknowledgement noted for the significant revisions made to the project <br /> Suggested time-of-year restriction for dock installation <br /> Commissioner expressed approval for house changes but concern about dock’s necessity <br /> The Chair struggles with Regulation 27, as the project meets all standards <br /> Discussed potential future changes in floodplain configuration due to climate change <br /> Commissioners debated cumulative effects and coastal resiliency considerations <br />Final Discussions <br /> The representative reminds the Commission of previous approvals for the dock <br /> Discussed expired permits and current regulatory language <br /> Commissioners acknowledge the need for updating regulations <br /> The Chair emphasized the need to consider coastal resiliency layers in future decisions <br />Agent Comments <br /> Revised plans submitted showing correct setbacks from wetlands to work limit <br /> The house was moved approximately 18 feet landward and connected to the garage. <br /> Garage doors were revised to face the street side, so the driveway was also modified to <br />accommodate that change <br /> House reduced to 4 bedrooms (no BOH filing required) <br /> An additional test pit was performed to check groundwater. The water level was found <br />below the design-adjusted elevation <br /> With moving the house, the septic profile elevations were revised slightly to achieve 6.2' <br />of groundwater separation. <br /> Pier revised to include a height of 6' over BVW and Salt Marsh <br /> Over 1800 sq ft of area to be restored with native plantings. <br /> The plan view shows a flood vent calculation identifying the number of vents that will be <br />proposed and that will meet the building code. <br /> The site has been re-staked for clarification <br /> <br /> Board of Health: New construction must meet full compliance with BOH I/A Septic <br />Systems Regulation. Floorplans for proposed new dwelling to be reviewed upon <br />submission to Building Dept. Proposed septic design plans are to be reviewed upon <br />submission to BOH. <br /> <br /> Building: ZBA hearing 11/13 <br /> <br /> Wastewater: There is no planned connection to the Mashpee Sanitary Sewer Collection <br />Systems <br /> <br /> Harbormaster: No navigational or abutter concerns <br /> <br />10 <br /> <br /> <br />