Laserfiche WebLink
MOTION <br /> Mr. Sahl made a motion to close and issue with the condition that all dock work be <br />completed between June-December and a signed 3-year contract on the restoration <br />plantings. <br /> Ms. Godfrey seconded the motion <br /> ROLL CALL: Mr. Sahl (Yes), Ms. Zollo (No), Ms. Godfrey (Yes), Mr. Colombo (Yes) <br />The motion passes (3:1) <br /> <br />Documents provided: Cape and Islands Engineering, Inc.; Notice of intent application and project narrative; <br />10/17/24 “Proposed site plan” <br /> <br />6:45 <br />NOI #43-3318 <br /> 24 Popponesset Island Road, 260 Heath Street Realty Trust <br />Representative: Chuck Rowland, Cape and Islands Engineering, Inc. <br /> <br />Proposed Reconstruction and Revisions <br /> Previous hearing 10/10 <br /> Proposed reconstruction of existing timber pile-driven pier <br /> Removed bump out at the end, added through flow penetration decking for entire <br />boardwalk and pier <br /> Handrails depicted on cross-section and side profile <br />Environmental Considerations <br /> Project adjoins saltmarsh but not directly above it <br /> Pier faces northeast to southwest, minimal shading on saltmarsh <br /> Mitigation discussed for shellfish seeding <br /> The representative spoke with the shellfish constable about the mitigation assessment <br /> Calculation for mitigation: $1,104 for area above 200 sqft <br />Licensing and Documentation <br /> Chapter 91 licenses from 1967 (original date), 1970 (first construction configuration) a, <br />and 1997 (current configuration) <br /> The site has a certificate of compliance and order of conditions approved by the <br />commission <br /> Existing structure fully licensed and construed per plans <br /> Existing boardwalk, pier, ramps, floats, and piles to be replaced in kind <br /> The Division of Marine Fisheries (DMF) letter dated October 10 discussed <br />Float Considerations and Regulations <br /> DMF refers to float stops at 2.5ft; local regulations call for 1ft <br /> Float stops are not practical for this configuration <br /> Minimum depth of 12 inches of water at mean low tide required under floats <br /> Project meets Performance Standards 6 in Regulation 27 <br />11 <br /> <br /> <br />