My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/24/2024 CONSERVATION COMMISSION Minutes (2)
>
10/24/2024 CONSERVATION COMMISSION Minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 9:19:34 AM
Creation date
3/13/2025 9:09:58 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
10/24/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Added drywells for roof runoff <br /> Specific grading for driveway connection runoff containment <br />Environmental Considerations <br /> Revised plan (Oct. 16) shows added drywells and drywell details <br /> Native plantings (1500 sq ft) proposed as natural filtering system <br /> Discussion on pervious material for driveway <br /> Preference for bituminous concrete due to maintenance concerns <br />Driveway and Runoff Management <br /> Suggestions to add trench drains at driveway ends <br /> Regrading to contain surface runoff <br /> Discussion on living space above garage (family room) <br /> Confirmation that the number of bedrooms will remain at 4 <br />Zoning and Compliance <br /> Project pending ZBA approval <br /> COCs to be closed before work commences <br />o COCs must be closed to ensure compliance with previous regulations and <br />approvals <br /> Drain along driveway edge <br />o Help manage surface water runoff effectively <br />o Prevent water from flowing onto the street, reducing the risk of flooding and <br />erosion <br />o Implementing this drainage solution can enhance the overall sustainability of the <br />property by protecting nearby wetland resources <br /> Three-year contract for wetland monitoring <br />Agent Comments <br /> Applicant consultant submitted revised plans showing dry well locations and driveway <br />grading details <br /> If the commission approves the project, the Agent recommends a condition of submission <br />of a signed 3-year contract between the homeowner and the Wetland Consultant or <br />certified horticulturist for monitoring and maintenance of all mitigation plantings. <br /> <br /> Board of Health: BOH currently permits property for four (4) bedrooms. Adding any <br />habitable space above the proposed garage that meets the bedroom definition would be <br />considered an increase in flow and require a septic upgrade and full compliance with <br />BOH I/A Septic Systems Regulation. Setbacks from the tank and SAS must be <br />maintained, or a variance must be requested. Access to septic components must be <br />maintained. Note the location of the septic system and restrict equipment/ vehicle traffic <br />over non-load bearing (H-10) components. <br /> <br /> Building: Application submitted to ZBA <br /> <br />5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.