Laserfiche WebLink
 Added drywells for roof runoff <br /> Specific grading for driveway connection runoff containment <br />Environmental Considerations <br /> Revised plan (Oct. 16) shows added drywells and drywell details <br /> Native plantings (1500 sq ft) proposed as natural filtering system <br /> Discussion on pervious material for driveway <br /> Preference for bituminous concrete due to maintenance concerns <br />Driveway and Runoff Management <br /> Suggestions to add trench drains at driveway ends <br /> Regrading to contain surface runoff <br /> Discussion on living space above garage (family room) <br /> Confirmation that the number of bedrooms will remain at 4 <br />Zoning and Compliance <br /> Project pending ZBA approval <br /> COCs to be closed before work commences <br />o COCs must be closed to ensure compliance with previous regulations and <br />approvals <br /> Drain along driveway edge <br />o Help manage surface water runoff effectively <br />o Prevent water from flowing onto the street, reducing the risk of flooding and <br />erosion <br />o Implementing this drainage solution can enhance the overall sustainability of the <br />property by protecting nearby wetland resources <br /> Three-year contract for wetland monitoring <br />Agent Comments <br /> Applicant consultant submitted revised plans showing dry well locations and driveway <br />grading details <br /> If the commission approves the project, the Agent recommends a condition of submission <br />of a signed 3-year contract between the homeowner and the Wetland Consultant or <br />certified horticulturist for monitoring and maintenance of all mitigation plantings. <br /> <br /> Board of Health: BOH currently permits property for four (4) bedrooms. Adding any <br />habitable space above the proposed garage that meets the bedroom definition would be <br />considered an increase in flow and require a septic upgrade and full compliance with <br />BOH I/A Septic Systems Regulation. Setbacks from the tank and SAS must be <br />maintained, or a variance must be requested. Access to septic components must be <br />maintained. Note the location of the septic system and restrict equipment/ vehicle traffic <br />over non-load bearing (H-10) components. <br /> <br /> Building: Application submitted to ZBA <br /> <br />5 <br /> <br /> <br />