My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/23/2023 CONSERVATION COMMISSION Minutes
>
02/23/2023 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 5:00:21 PM
Creation date
3/19/2025 8:35:38 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
02/23/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
o The motion passes unanimously <br /> Documents provided: Cape&Islands Engineering,Inc.,Request for Determination of Applicability <br /> 01/23/2023 Plan"Septic Design Plan"(increase in design) <br /> 6:12 NOI <br /> 4 Mute Swan Circle,Patricia Donnelly&Roger Schiffman <br /> • Representative: Cape&Islands Engineering, Inc <br /> Project Overview <br /> • Existing construction of dwelling unit and planned pier under prior order of conditions <br /> • Proposal for vista pruning from the limit of work to the edge of the salt marsh <br /> • Vista pruning proposed according to Mashpee protocol <br /> Pruning Details&Clarifications <br /> • No clear-cutting planned, mainly limiting some trees within the corridor <br /> • Some dead trees may need removal for safety reasons <br /> • No heavy equipment usage is required for pruning <br /> • Property is on sewer,no on-site septic system <br /> • Clarification on 25%rule: applies to length along salt marsh within marked area <br /> • No removal of live trees <br /> Pruning Protocols& Oversight <br /> • Vista pruning protocols under Regulation 29 <br /> • Allowances: 10%removal of standing dead wood, 20%of saplings, 30%of branches for <br /> mature trees <br /> • On-site oversight and 3 years of contractor supervision required <br /> • Possibility of leaving dead trees on the ground for wildlife habitat <br /> Pier&Pathway Consideration <br /> • Discussion about trees near the proposed pier location <br /> • Approved pier plan includes a 4 ft wide pathway through buffer strip <br /> • Minimal tree cutting expected for pier construction <br /> • Possibility of adjusting alignment to protect specimen trees <br /> Agent Comments <br /> • Proposed vista pruning with maintenance in perpetuity. <br /> • Standard vista pruning request with max corridor width at 28 feet(25%of 112 linear feet <br /> of frontage along wetland edge). <br /> • All vista pruning protocols will be conditioned as per Regulation 29. <br /> • Recommendation <br /> o Close and Issue <br /> Motion <br /> • Ms. Clapprood made a motion for a close and issue with boilerplate language and agent <br /> supervision. Ms. Godfrey seconded the motion <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.