My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/23/2023 CONSERVATION COMMISSION Minutes
>
02/23/2023 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 5:00:21 PM
Creation date
3/19/2025 8:35:38 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
02/23/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Motion made by Ms. Copeland for the continuance to March 9. Ms. Clapprood seconded <br /> the motion <br /> • Roll Call: Ms. Clapprood (Yes), Ms. Godfrey(Yes),Ms. Copeland (Yes),Mr. Colombo <br /> (Yes) <br /> o The motion passes unanimously <br /> Documents provided: Cape&Islands Engineering,Inc.,Request for Determination of Applicability, <br /> 01/23/2023 Plan"Septic Design Plan"(no increase in flow) <br /> 6:09 RDA <br /> 33 & 37 Horseshoe Bend Way,Robert S. Durant, Trustee <br /> • Representative: Cape&Islands Engineering, Inc. <br /> Project Overview <br /> • Proposed removal of existing cesspool and upgrade to Title 5 septic system <br /> • Increase in flow from 2-bedroom to 3-bedroom system <br /> • Property consists of lots 2E and IE, combined area of 31,800 sqft <br /> • No proposed renovations or changes to the dwelling <br /> • Failed cesspool requiring upgrade <br /> Setback Constraints <br /> • Unable to fit system outside 70 ft from coastal bank <br /> • Received comments from the Board of Health <br /> • Proposal to include an I/A system <br /> • Willing to accept condition for I/A system inclusion <br /> Discussion & Continuance <br /> • Similar situation to the previous case, different setback <br /> • Limited options due to a 75 ft setback to the top of the inland bank <br /> • Proposed Fast system as the I/A solution <br /> • Decision to continuance for preparation of paperwork <br /> Agent Comments <br /> • Failed septic system to be upgraded to standard title V system. <br /> • No increase in living space. <br /> • An I/A system is not recommended as the technology does not remove phosphorous, <br /> which is the contributing nutrient to harmful algal blooms in freshwater bodies. <br /> • Recommendation <br /> o A negative determination <br /> Motion <br /> • Motion made by Ms. Clapprood for a continuance to March 9r11 at 6:12. Ms. Godfrey <br /> seconded the motion. <br /> • Roll Call: Ms. Clapprood (Yes), Ms. Godfrey(Yes),Ms. Copeland (Yes),Mr. Colombo <br /> (Yes) <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.