My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/23/2023 CONSERVATION COMMISSION Minutes
>
02/23/2023 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 5:00:21 PM
Creation date
3/19/2025 8:35:38 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
02/23/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Roll Call: Ms. Clapprood (Yes), Ms. Godfrey(Yes),Ms. Copeland (Yes),Mr. Colombo <br /> (Yes) <br /> o The motion passes unanimously <br /> Documents provided: Gade Masonry&Landscaping Request for Determination of Applicability,11/22/2022 <br /> Plan"Landscape Plan" <br /> 6.06 RDA <br /> 43 Horseshoe Bend Way,Robert S. Durant, Trustee <br /> • Representative: Cape&Islands Engineering, Inc <br /> Project Overview <br /> • Proposal to remove existing cesspool and upgrade to Title 5 septic system <br /> • Replacement of failing cesspool for existing 2-bedroom house <br /> • Septic system located as far landward as possible <br /> • Leach field approximately 70ft away from the coastal bank <br /> • No increase in flow or proposed additions to the dwelling <br /> • Estimated groundwater level at 43 ft(pond level), septic system at 70 ft elevation <br /> Environmental Considerations <br /> • Existing cesspool in the vicinity of proposed septic tank <br /> • Efforts to avoid the naturally vegetated area <br /> • Perk rate of 2 minutes an inch <br /> • 27 ft separation between the septic system and groundwater level <br /> Regulatory Issues& Continuance <br /> • The Health Agent raised concerns about the septic upgrade <br /> • Portion of upgrade falls within 75 ft setback to top of inland bank <br /> • Area in Zone 2 water recharge area requiring additional treatment <br /> • Continuance requested to revise the plan and address Board of Health regulations <br /> • Discussion on the possibility of relocation chamber to avoid I/A septic system <br /> requirement <br /> • Commission emphasis on environmental stewardship and groundwater protection <br /> • Chair stance against allowing another Title 5 system in the ground <br /> • Continuance granted to March 9TH,AT 6:09 <br /> Agent Comments <br /> • Failed septic system to be upgraded to standard title V system. <br /> • No increase in living space. <br /> • An I/A system is not recommended as the technology does not remove phosphorous, <br /> which is the contributing nutrient to harmful algal blooms in freshwater bodies. <br /> • Recommendation <br /> o A negative determination <br /> Motion <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.