Laserfiche WebLink
90 Wheeler Road, George L. Rice, Jr. &Jennifer C. Rice <br /> • Representative: JC Engineering, Inc. <br /> • Request for a continuance of January 23,2025 <br /> • Reasoning: More time to address issues raised <br /> Agent Comments <br /> • The agent provided the following comments to the applicant's representative: <br /> I. The mitigation calculation chart used is the old one. Applicants need to <br /> recalculate mitigation using the revised chart,which I provided to them <br /> 2. The proposed mitigation plantings are mostly groundeover. I recommended a <br /> greater diversity of vegetative strata in a revised mitigation planting plan <br /> 3. I commented that the proposed structures(house,pool,patio, garage)represent a <br /> substantial increase in impervious surface compared to existing conditions. I <br /> recommended reducing the size of proposed structures. <br /> Motion <br /> • Mr. Cook motioned to approve the continuance. Ms. Zollo seconded the motion. <br /> • Roll Call: Mr. Cook(Yes), Ms. Zollo (Yes),Ms. Thombrugh (Yes), Ms. Godfrey(Yes), <br /> Mr. Sahl(Yes), Mr. Colombo (Yes) <br /> o The motion passed unanimously. <br /> Documents provided: JC Engineering,Inc.; Notice of Intent application and project narrative;12/05/24 Plan <br /> "Proposed Site Plan"(2 sheets) <br /> 6:45 NOI #43-33 <br /> 231 Vineyard Reach,Vineyard Reach Condominium Association <br /> • Representative: Wet Tech Land Design,Inc <br /> • Proposed invasive species removal, management, and retaining wall construction <br /> • Project covers 17,000 sqft,no structures involved <br /> Vegetation Management and Planting Plan <br /> • Removal of willow trees <br /> • Replacement with 143 wildlife-friendly plants <br /> • Removal of invasive species on upper slope <br /> • Mechanical removal method to be used, no herbicides <br /> • Preservation of existing beneficial native plants <br /> Construction and Erosion Control <br /> • Small excavator to be used with willow removal <br /> • Retaining wall (2-3 ft high)to be constructed using segmental blocks <br /> • Erosion control measures to be implemented <br /> • Concerns raised about lack of topography on plan <br /> • Request for cross-section and more detailed plans <br /> Environmental Considerations <br /> • Discussion about potential wildlife in the man-made pond <br /> 8 <br />