My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/09/2025 CONSERVATION COMMISSION Executive Session
>
01/09/2025 CONSERVATION COMMISSION Executive Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 5:00:19 PM
Creation date
3/21/2025 2:28:59 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Executive Session
Meeting Date
01/09/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Concerns about using herbicides near water <br /> • Request for more information on pond creation and existing wildlife <br /> • Clarification on Mashpee's 75 ft buffer zone regulation <br /> • Need for updated waiver request reflecting correct buffer zone <br /> Additional Requirements and Next Steps <br /> • Confirmation that pond is jurisdictional under the wetland protection act <br /> • Request for timeline of vegetation removal and retaining wall construction <br /> Agent Comments <br /> • Wetland is manmade but still jurisdictional <br /> • Proposed removal/eradication of invasive species and planting of native species. <br /> • Proposed landscape retaining wall with backfill grading in areas where existing <br /> embankment is in close proximity to existing hardscaping. <br /> • If commission approves activities, the Agent recommends the following conditions: <br /> 1. Submission of a signed 3-year monitoring contract between the condo <br /> association and a certified horticulturalist or wetland consultant <br /> 2. A licensed professional must do the application of herbicides <br /> y Board of Health: The project is under the New Seabury Special Permit. There is <br /> no ZBA jurisdiction. The project may or may not require a building permit. <br /> Commissions Decisions and Actions <br /> • Continuance accepted pending the receipt of the DEP file number <br /> • Topographical details on the project plan <br /> • A letter of approval from New Seabury for work on their property <br /> • Clarification on the wall construction details(segmented block vs. concrete) <br /> • Erosion control measures and a limit of work line <br /> • Additional information regarding the waiver request under Regulation 19 <br /> • Historical data and inventory of the pond <br /> • Recommendations on protecting the damaged drainage pipeline <br /> Motion <br /> • Mr. Cook made a motion to accept the continuance. Ms. Godfrey seconded the motion <br /> • Roll Call: Mr. Cook(Yes), Ms. Zollo (Yes), Ms. Thombrugh (Yes), Ms. Godfrey(Yes), <br /> Mr. Sahl(Yes), Mr. Colombo (Yes) <br /> o The motion passed unanimously. <br /> Documents provided:Wet Tech Land Design,Inc.; Notice of Intent application and project narrative; <br /> l l/26/24 Plan`Erosion Prevention&Invasive Species Management Plan" <br /> 6:48 NOI #43-3325 <br /> 50 Kim Path, Beth A. McGinnis, Trustee, of the Beth McGinnis Family Trust <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.