Laserfiche WebLink
1RP UPDATE <br /> To <br /> Mashpee Board of Selectmen <br /> April 9, 2001 <br /> 1. CS-10: <br /> - Treatment systems operating as designed <br /> -Draft Remedial Investigation Report submitted for EPA/DEP review March 2 <br /> -Draft Feasibility Study scheduled November 17 <br /> -Final remedy to include fingers at leading edge <br /> 2. 3rd Well <br /> -Working access, drill this summer <br /> 3. SD-5 <br /> -Extraction systems continue operating <br /> -Wheeler recirculating well shut down with regulator concurrence <br /> -Hillside recirculating well operating as designed <br /> 4. FS-1 <br /> - Treatment system operating, EDB reduced, occasional detect in bogs, none at outlet <br /> -Draft wellfield design scheduled June 18, refining layout with regulators <br /> - Cultural survey requested by Wampanoags <br /> 5. Cranberry agreements <br /> - 2000 payment agreed to <br /> - Agreement for future payments being finalized <br /> 6. Eastern Briarwood plume <br /> - Sporadic detections prompting expansion of monitoring <br /> 7. Ashumet Pond Phosphorus <br /> - Alum treatment scheduled for September <br /> 8. Residential Well Program <br /> - Advertizing for new participants <br /> - Coordinating with DPH to drop some properties no longer at risk <br /> 9. Surface Water Testing <br /> - Continued funding to town for testing <br /> 10. Information Meetings <br /> -May 30, August 23 <br />