Laserfiche WebLink
M H ASHPEE HIGH SCHOOL <br /> Cost Analysis <br /> Prepared by Deirdre Greelish 11/93 <br /> Cher possible costs of MashPee High School <br /> MM Middle Sch MM + 3% infl. MM + 6% infl. <br /> $81.27 $83.71 $86.15 <br /> x building size 190,000 190,000 190,000 <br /> = cost of construction 15,441,300 15,904,539 16,367,778 <br /> ite work 1,820,000 1,820,000 1,820,000 <br /> ontingency 5%1 863,065 5% 886,227 5% .909,389 <br /> ubtotal 18,124,365 18,610,766 1 19,097,167 <br /> djusted Cost per s.f. _ $95.39 $97.95 $100.51 <br /> dmin & Eng. 7% 1,208,291 7% 1,540,718 7% 1,573,144 <br /> urnishings/equip. 15% 2,589,195 15% 2,658,681 15% 2,728,167 <br /> otal Project Cost: 21,921,851 22,810,165 23,398,478 <br /> INISHED COST/s.f. $115.38 $120.06 $123.15 <br /> emember that the State defines the size of our school as follows: <br /> 1000 students @ 155/sf 155,000 <br /> W1 core for 350 25.000 <br /> otal allowable space 180,000 <br /> ommittee is adding 10,000 s.f. for"community use" <br /> epresents $1-$1..5M in the project for community use items <br /> ontingency based on % of Construction cost + site work <br /> dmin & Engineering uses 7% for architect fee + $300,000 admin and engineering <br /> urnishings/equip based on % of Construction cost + site work <br />