Laserfiche WebLink
Commercial and Industrial Construction Fees <br /> Commercial New Constriction sq.ft.x 75 x c.f.x 0.0100=Fee <br /> Minimum Fee$225.00 <br /> Additions sq.ft.x 60 x c.f x 0.0100=Fee <br /> Minimum Fee$225.00 <br /> Alterations sq.ft.x 60 x c.f.x 0.0100 Fee <br /> Minimum Fee$175.00 <br /> Industrial New Construction sq.ft.x 60 x c.f.x 0.0100=Fee <br /> Minimum Fee$225.00 <br /> Additions sq, ft.x 50 x c.f x 0.0100=Fee <br /> Minimum Fee$225.00 <br /> Alterations sq,ft.x 50 x c.f.x 0.0100=Fee <br /> Minimum Fee$175.00 <br /> Commercial or Industrial: <br /> Awning $100.00 <br /> Roofing $100.00 <br /> Siding $100.00 <br /> Combination $175.00 <br /> Carnivals $50.00 <br /> Final determinations are made by the Building Department <br />