My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/08/1998 SELECT BOARD Minutes
>
06/08/1998 SELECT BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 5:02:54 PM
Creation date
4/1/2025 8:55:31 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SELECT BOARD
Meeting Document Type
Minutes
Meeting Date
06/08/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Board of Selectmen <br /> Minutes 2 <br /> June 8, 1998 <br /> APPOINTMENTS BE <br /> Firg Station Building Committee -Project Status Report: (continued) <br /> The Fire Station Building Committee is expected to bring forth a formal proposal <br /> to the Board of Selectmen regarding the site selection of the future Fire Station <br /> sub-station. It was noted that two acres of the subject property will be utilized <br /> for the South Mashpee station. <br /> Mr. Vaccaro indicated that the design schematic for the renovation and <br /> rehabilitation of the Fire and Rescue Station was re-designed by the project <br /> architect in an effort to conform to budgetary constraints. <br /> Growth in the local economy has determined increases in general construction <br /> costs and unit costs per square foot informed Mr. Vaccaro. As a result, the <br /> budget estimate to renovate the existing main station is approximately $3 million. <br /> The basement option which is not included is estimated to cost an additional <br /> $250,000. <br /> Mr. Vaccaro indicated that the committee is presently considering options to <br /> increase the square footage of the facility by utilizing space above the apparatus <br /> bay area. <br /> Selectman. Caffyn suggested the Board consider scheduling a mini town meeting <br /> to bring this matter before the voters. In addition, cost estimates relative to the <br /> impact on the tax rate should be considered. <br /> It was noted that a $3 million dollar project would have an impact of.29 cents or <br /> S42.00 on a median value home of$143,000 for fifteen years. <br /> Mr. Vaccaro indicated that the committee's first preference is to rehab the <br /> main station, but due to budget constraints, it is more economical to move <br /> forward with the construction of a sub-station in South Mashpee which has been <br /> estimated to cost $1.1 million. <br /> At a minimum, it is necessary to expend $218,000 to repair the ventilation <br /> system, replace the overhead doors, address life safety issues and the termite <br /> infestation at the main station informed Mr. Vaccaro. It was noted that Town <br /> Meeting approved the expenditure of$30,000 to address ventilation issues. <br />
The URL can be used to link to this page
Your browser does not support the video tag.