My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/13/2000 DESIGN REVIEW COMMITTEE Minutes
>
12/13/2000 DESIGN REVIEW COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 5:00:26 PM
Creation date
4/1/2025 1:33:09 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
DESIGN REVIEW COMMITTEE
Meeting Document Type
Minutes
Meeting Date
12/13/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Design Review Committee -3- December 13, 2000 <br /> 2. Johnny's Tube & Lube — 723 Falmouth Road <br /> The proponent Johnny's Tube & Lube last appeared before the committee on <br /> November 8, 2000. The proponent has modified plan slightly and addressed <br /> width of buffer issue. Currently seeking variances for frontage and setback from <br /> Board of Appeals, and variance for continuation of previous gasoline station use. <br /> The lot and existing building are nonconforming. The proponent has applied for <br /> relief from setback requirements from Wags Road and Falmouth Road. The <br /> current setback requirement is 150' from Route 28. Committee feels setback <br /> from Wags Road would have to be 75', and 25' natural buffer with no parking; <br /> variance needed to park within buffer. Since this is zoned as industrial.land, the <br /> current parking space area could be reduced. <br /> The architecture plan is to change the dormers on existing building. Committee <br /> feels the dormers should be raised up to facilitate planned shingle roof. <br /> There is regrading shown on current plan, with several feet difference in grade in <br /> areas. The roof of existing building is level with grade now, and planned new <br /> grading is far above building height. There will be a need for 4' retaining wall, <br /> perhaps concrete block. <br /> On landscaping, a new split-rail fence is planned. The existing bank of trees will <br /> remain. The trees should be planted 30' on center. There is now Burning Bush <br /> border all down the side of the property, and some evergreens should be worked <br /> in here 5' on center. No trees should be planted at front of lot, for visibility. <br /> The Bradford trees should be pulled closer in. The proponent should check with <br /> the DPW on this. Shrubbery should be denser on the front side, with more low <br /> junipers to cover ground area. <br /> Proponent Johnny's Tube & Lube should show handicap access on plan. The <br /> buffer and landscape should be detailed out on the plan, and redesign the back <br /> grading area for a retaining wall. Since the proposal is for a three-bay service <br /> station, the committee would want additional traffic flow details. The committee <br /> feels that this type service station usage is needed in Mashpee. <br />
The URL can be used to link to this page
Your browser does not support the video tag.