Laserfiche WebLink
To do: <br /> • Jack will look at parking and handicap parking space. <br /> • Modify Parking. <br /> • Modify details for landscaping Plan. <br /> • Get revised Plans to Building Department for Design Review. <br /> Mashpee Commons <br /> Buildings 12Az 29, 16 and 17 <br /> Douglas Storrs appeared. He said this is just a first cut preliminary review. In this next <br /> phase they'll construct Buildings 12A, 29, 16 and 17 and do minor parking lot alterations <br /> behind Building 16. <br /> Parking...He noted they're required to have 900+ spaces; they have 1100+. Suggestion was <br /> made that he should keep in mind distance requirement from parking to building entrance. <br /> Douglas Storrs showed building design plans and these were discussed in detail. He noted <br /> the first floor will be all retail. There will be 24-26 residential units. Goal: Do 4 buildings <br /> all at once...hopefully start in September. <br /> Dumpsters: It was suggested that they need more dumpsters; he said they're looking at more <br /> frequent pick-up. <br /> Next step is they are going to ZBA and then they'll come back to Design Review with <br /> detailed Plan. <br /> 735 Falmouth Road <br /> Office Building <br /> Applicant—Michael Talbot/Dave Hendricks <br /> Representative—Cape&Islands Engineerin <br /> No representative attended. <br /> Conclusion: They have to bring building plans and a Plan List. <br /> Adjournment...Meeting was adjourned at 11.40 a.m. <br /> Respectfully submitted, <br /> ''6�� A"47 <br /> Oeen Giliberti <br /> cording Secretary <br /> 2 <br />