My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/23/2005 DESIGN REVIEW COMMITTEE Minutes
>
06/23/2005 DESIGN REVIEW COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 5:03:05 PM
Creation date
4/1/2025 2:55:54 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
DESIGN REVIEW COMMITTEE
Meeting Document Type
Minutes
Meeting Date
06/23/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Site Plan and Landscape Review <br /> Wags Road,Dry Harbor Enterprises <br /> Plan Change original plans denied <br /> Boat Storage " <br /> Kevin Kirrane <br /> Kevin Kirrane addressed the committee stating that at the last meeting there was a question raised relative to <br /> interpretation of language that was in the Pyrotech Engineer's report and concern having to build a fence that <br /> was the height of the boats. Mr. Kirrane said he believes it has been clarified by the 5/25/05 letter from <br /> Pyrotech Consultants which clarifies the fact that the .fire retardant material to be used need be only as high as <br /> the fence, which is to be 6 feet high. <br /> Following are highlights of the discussion held: <br /> • Kevin Kirrane advised that NStar has to issue final approval. <br /> • Design Review requires that they receive a letter from the Fire Chief indicating Fire Department <br /> approval. <br /> • Corrugated metal fence will be at 8 foot border as noted and approved on Landscape Plan. <br /> • Open chain fence will be on buffer and landscaping will be outside the fence <br /> • Revised Plan to go to ZBA. <br /> Conclusions: <br /> 1. Approved subject to Fire Department approval. Letter to Design Review from Fire Chief <br /> indicating Fire Department approval needed. <br /> 2. Landscape Plan approved as noted. <br /> 11 Cape Drive <br /> Addition to Office Building <br /> Kevin Kirrane <br /> Attorney Kevin Kirrane, John Slavinsky(Engineer), Geoff Willis and Jean Willis were present. Kevin Kirrane <br /> showed the site Plan. Essentially they are duplicating the existing building to the rear. Kevin Kirrane noted <br /> they would be going to the ZBA for Special Permit. Following points were discussed: <br /> • Walter Yarosh advised he did walk the site and cautioned that they be careful to keep the tree buffer that <br /> is there since it is buffer between the building and the restaurant. <br /> • One of the issues on Cape Drive is the water that comes in; they're putting in 2 more catch basins. <br /> • Signage looks nice. <br /> • Landscape Plan—suggest they look at planting some vegetation in front of the wall,but up to applicant. <br /> Not requested by Design Review. <br /> Conclusion: Site Plan approved; Landscape Plan approved with suggestion they consider putting some <br /> vegetation in front of the wall; and Building Plan approved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.