My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/05/2010 DESIGN REVIEW COMMITTEE Minutes
>
10/05/2010 DESIGN REVIEW COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 5:01:15 PM
Creation date
4/2/2025 10:05:16 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
DESIGN REVIEW COMMITTEE
Meeting Document Type
Minutes
Meeting Date
10/05/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
154 Industrial Drive {continued} <br /> • They found a self-support tower and they are looking to put up 3 antennas, 6 lines of cable will <br /> go down to the base of the tower, and 1 equipment cabinet. <br /> • Very small installation so they're looking to co-locate on existing tower. <br /> • They approached Cape Cod Commission who waived their process. <br /> • Rich Stevens said he noticed in the original permit that no more than 20 users allowed at one <br /> time. There appears to be 4 or 5 carriers there now. <br /> • Bob Nelson stated this is very similar to what we approved they are merely making an <br /> addition on to existing tower. <br /> • Ben Perry said they are going to broad wireless net signal %2 to 1 mile away. Will this interfere <br /> with current system residence have? Mr. Kallio responded "no" Clear Wire has its own <br /> frequency. <br /> Charlie Maintanis asked whether engineer states how cabinet is going to be attached to the <br /> tower. Mr. Kallio said the 7X7 cabinet will be brought in on a poured concrete base and the <br /> cabinet will be vented. <br /> • Clear Wire has emergency contact should Fire Department need assist to extricate from tower. <br /> • Glen Harrington asked whether there would be any testing requirement if added to the tower. <br /> Response was that testing done every 3 years. <br /> Motion: Glen Harrington motioned to approve to modify the Special Permit and to install the 3 <br /> antennas, 6 lines of cabling and 1 equipment cabinet as submitted in the Clear Wire plan; Tom <br /> Fudala seconded the motion. <br /> i <br /> Roll Call.Vote of Design Review: All voted "yes". <br /> Roll Call Vote of Plan Review: All voted "yes". <br /> I <br /> Approval of Minutes <br /> Glen Harrington motioned to approve the minutes of the Design Review/Plan Review combined <br /> meeting of August 1.2,20-1O-as_presented; Charlie-Maintanis-seconded-this motion. — <br /> Design Review members had already approved these minutes at the September 23ro Design <br /> Review/Plan Review combined meeting. <br /> Roll Call Vote: All Plan Review Committee members voted yes, except Tom Fudala and Ben <br /> Perry, who both abstained. The motion passed. <br /> Tom Fudala motioned to approve the minutes of the Design Review/Plan Review combined meeting <br /> of September 23, 2010 as presented; Ben Perry seconded this motion. <br /> Roll Call Vote of Design Review: All voted "yes". <br /> Roll Call Vote of Plan Review: All voted "yes", except Glen Harrington and Joel Clifford, who <br /> both abstained. The motion passed. <br /> Adiournment...This joint meeting of Design Review and Plan Review adjourned at 9:45 a.m. <br /> Respectfully submitted, <br /> J n Gilib rti� , Recor g Secretary <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.