My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/26/2025 ZONING BOARD OF APPEALS Minutes
>
03/26/2025 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2025 3:00:41 PM
Creation date
4/29/2025 11:40:14 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
03/26/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> MARCH 26, 2025 <br /> Mr. Bonvie would like a vote that Town Counsel works with Attorney Kirrane in <br /> reference to issues in the finding and allowance of the review of the Variances which <br /> is the hardship and uniqueness of the lot, and make a recommendation to the Board <br /> whether there is a hardship and uniqueness because the other aspects are met. <br /> Mr. Millbury commented that he would like to see this be approved but stay within <br /> the rules. <br /> Mr. Bonvie doesn't believe he has enough knowledge with this magnitude of an issue. <br /> Mr. Reidy made a motion that the Board of Appeals refer this matter relative to, 1): <br /> whether the property meets the criteria for a Variance because of its unique <br /> conditions, and, 2): whether there is or there is not a substantial or financial <br /> hardship, and that Town Counsel discuss with Counsel for the Petitioners and report <br /> back to the Zoning Board of Appeals. <br /> Mr. Furbush second. All were in favor. <br /> 23 Wilsons Grove: Owners, Gary M. and Susan R. Gilberti, Trustees of the GSG <br /> Nominee Trust of 2017 request a Special Permit under §174-17.1 and §174-33 of the <br /> Zoning Bylaws to raze and replace an existing single family residential structure with <br /> a new single family structure on property located in the Popponesset Overly District <br /> and R-3 District, Map 118, Parcel 94, Mashpee, MA. (Continued from 3112125 <br /> hearings at the request of the Attorney). <br /> Sitting on this hearing are the four regular Board members and Mr. Milbury. <br /> Attorney Christopher Kirrane represented the homeowners for a request to raze and <br /> replace of their single-family dwelling. Also present was Brian Foley, with Clancy <br /> Construction. The lot is located in the Popponesset Overlay District that requires a <br /> minimum of 6,000 sq. ft. of lot coverage, 60 ft. of frontage, 25 ft. from the front <br /> setback, 15 ft. setback from the side and rear lot lines, 25% lot coverage, a maximum <br /> height requirement of 30 ft., and 50 ft. setback from wetlands. <br /> The lot is totally within the flood zone which has zero square feet of lot area. The <br /> existing lot consists of 3,374 sq. ft. of land area, but because it is within land subject <br /> to coastal storm flowage it has 100% lot coverage. Under the old dimensional <br /> requirement, the existing lot coverage is 36%, and the plans were revised to reflect <br /> the proposed lot coverage as the same at 36%. <br /> There are several nonconformities that currently exist. There is an existing deck in <br /> the rear of the lot that is.6 inches from the property line. There is also a shed that <br /> is less than 15 ft. from the property line; both structures will be removed. The front <br /> yard setback is improving from 7.0 ft. to 12.8 ft. The existing westerly side yard <br /> setback is 5.5 ft. is increasing slightly to 4.6 ft. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.