Laserfiche WebLink
of TMs s,s <br /> z. <br /> AU�1MLIUV��y <br /> own qf MaS 2 Panning Board <br /> c� <br /> 16 Great Neck RoadNorth <br /> 'Mashpee, 'Massachusetts 02649 <br /> 647 Falmouth Road will also have a very brief Public Hearing on April 30t", fora specialty <br /> grocery store over 10,000s.f., which is a mandatory referral to the Cape Cod Commission for <br /> DRI review. <br /> There is a Warrant Article for a proposed Visitors Centeron Rt. 28. Chairwould like Glen <br /> Davis to come to the Planning Board for 7:30PM. <br /> The Cape Cod Commission <br /> Public update meetings for the RPP were in March and the upcoming schedule for subregional <br /> meetings will be provided and held in early May. The plan is to have the first draft completed in <br /> late spring/ early summer and intend to have a 60 day public comment period that will overlap <br /> with subregional hearings in the summer. <br /> There is a new project in Provincetown, 44 Captain Berties Way, a proposed 36 unit build with <br /> 4 floors, 10 units will be affordable, and parking will be in the basement. <br /> Update on the bridge rebuild, Sagamore Phase 1 funding is secure, Bourne is not, $4.5 Billion <br /> with a projected completion in 2028. <br /> Chapter 91 License Application for 362 Monomoscoy Road <br /> Friendly reminder, forms need to be filled out and adequately signed. <br /> COMMITTEE REPORTS <br /> Cape Cod Commission - No Report <br /> Charter Review Committee- No Report <br /> Community Preservation <br /> Committee- Support for improving 475 Nathan Ellis Highway <br /> Design review- 868 Falmouth Road may come before this Board for large <br /> scale solar panels. <br /> Plan Review- 868 Falmouth Road for Large Scale Ground Mounted Solar <br /> Bylaw. Property is under a ZBA Special Permit, initially <br /> granted for mini warehouse storage and boat/RV storage. It <br /> was amended to provide U-Haul truck rental, both <br /> businesses still operate. There are 2 lots, looking to expand <br /> one lot with solar, and to reduce the other lot via an ANR as <br /> to no overlap with smaller lot. Applicant is also seeking <br /> waivers on solar dimension requirements. Only this Board <br /> can reduce the 100ft. requirement to 60ft. as a setback <br /> distance to residential lots. The second waiver is for height <br /> of devices, the bylaw allows for a 15ft. max. and the plans <br /> are proposing 22.2 ft. They are rotating panels with the <br /> sunlight. In 2023 this bylaw was codified to allow ground <br /> mounted solar in C2 and C3, as solar continues to grow. <br /> 6 <br />