Laserfiche WebLink
submission to the Building Department. Proposed septic design plans are to be reviewed <br /> upon submission to BOH. <br /> ➢ Building: Application for ZBA relief has been filed <br /> ➢ Wastewater: There is no planned connection to the Mashpee Sanitary Sewer Collection <br /> System <br /> Motion <br /> • Motion made by Mr. Cook to accept the continuance. Mr. Sahl seconded the motion. <br /> • Roll Call: Mr. Cook(Yes), Mr. Sahl (Yes), Ms. Godfrey (Yes), Mr. Colombo (Yes) <br /> o Motion passed unanimously <br /> Documents provided: JC Engineering,Inc.; Notice of Intent application and project narrative;Ol/16/25 Plan <br /> "Proposed Site Plan"(2 sheets) <br /> NOl 231 Vineyard Reach,Vineyard Reach Condominium Association <br /> 3-332 <br /> ➢ Continued from 1/9/2025 <br /> ➢ Representative: Wet Tech Land Design, Inc. <br /> ➢ Applicant requests a continuance to February 6, 2025 <br /> Motion <br /> • Motion made by Mr. Cook to accept the continuance. Mr. Sahl seconded the motion. <br /> • Roll Call: Mr. Cook(Yes), Mr. Sahl (Yes), Ms. Godfrey (Yes), Mr. Colombo (Yes) <br /> o Motion passed unanimously <br /> Documents provided: Wet Tech Land Design,Inc.; Notice of Intent application and project narrative; <br /> 11/26/24 Plan`Erosion Prevention&Invasive Species Management Plan" <br /> NOI 50 Kim Path, Beth A. McGinnis, Trustee, Beth McGinnis Family Trust <br /> 43-3325 <br /> ➢ Continued from 1/9/2025 <br /> ➢ Representative: Cape &Islands Engineering, Inc <br /> Project Details and Updates <br /> • Raze and replace an existing single-family dwelling with deck, stairs, drywells, <br /> associated appurtenances, landscaping, and a Title 5 system upgrade <br /> • Revised plan: added wall dimensions on westerly and northly sides showing 3.9-4.7ft <br /> spacing between walls <br /> • Wall heights documented: western wall— 1.1ft high (top 8.04, bottom 6.9), northern wall <br /> — 1 ft high <br /> 9 <br />