Laserfiche WebLink
• Questions raised about why the project couldn't be moved entirely outside the 50ft buffer <br /> zone <br /> • Questions about pool maintenance and water disposal(should be pumped and removed <br /> off-site) <br /> • Concerns about the need for the proper limit of work staking along the north and south <br /> property lines <br /> • Staff noted the applicant reduced the size from the original plan before the first hearing <br /> • Staff raised concern that house setback benefit is diminished by being replaced with other <br /> structures <br /> • Staff noted mitigation improvements include more vegetative strata as requested <br /> • Discussion about nitrogen calculations and Board of Health review for the 5-bedroom <br /> plan <br /> • The Commission is concerned about the lack of a detailed landscape plan <br /> Additional Discussions <br /> • Commissioner suggests pervious pavers for the patio and possibly for the driveway <br /> parking area <br /> • Multiple commissioners express desire to move structures out of the 50ft buffer <br /> • Owner expresses concerns about losing sunset views if the house is moved back further <br /> • Discussion of whether the pool could be removed or scaled down (pool dimensions: <br /> 15.5ft x 30ft) <br /> • Owner explains pool is desired because the lake is sometimes unsafe for swimming <br /> • Owner willing to consider compromises but concerned about major changes <br /> • Commissioners suggest possibly moving the pool back 15-20ft to get the majority outside <br /> the buffer <br /> • Discussion about possibly reducing house size or angling positioning <br /> Continuation &Next Steps <br /> • Applicant requests a continuance to February 201 <br /> • Applicant needs to submit: 1. Revised plans showing structures moved further from the <br /> 50ft buffer if possible. 2. Detailed landscape plan 3. Nitrogen calculations to comply with <br /> Regulation 30, 4. Board of Health application for a 5-bedroom variance. Limit of work- <br /> staking plan 6. Note about pool maintenance, water disposal <br /> • Commissioners expressed willingness to work with the applicant <br /> • Staff will assist the applicant with addressing missing pieces <br /> Agent Comments <br /> • Correspondence with a consultant regarding some project concerns, including reference <br /> to the old mitigation calculations chart and the overall footprint of proposed activities. <br /> The consultant made revisions, including the use of an updated mitigation chart, <br /> adjustments to mitigation plantings to enhance vegetative strata, and reductions in the <br /> footprints of the garage,pool, and patio. <br /> ➢ Board of Health: New construction must meet full compliance with BOH I/A Septic <br /> Systems Regulation. Floor plans for the proposed new dwelling are to be reviewed upon <br /> 8 <br />