Laserfiche WebLink
• Motion made by Mr. Cook to accept the continuance. Mr. Sahl seconded the motion. <br /> • Roll Call: Mr. Cook(Yes), Mr. Sahl (Yes), Ms. Godfrey (Yes), Mr. Colombo (Yes) <br /> o Motion passed unanimously <br /> Documents provided: Cape &Islands Engineering,Inc.; Notice of Intent application and project narrative; <br /> 12/12/24 Plan"Proposed Pier Plan" <br /> O[ 90 Wheeler Road, George L. Rice Jr. and Jennifer C. Rice <br /> 3-3324 <br /> ➢ Continued from 1/9/2025 <br /> ➢ Representative: JC Engineering, Inc. <br /> Project Details <br /> • Raze and replace an existing single-family dwelling <br /> • Property has been family owned for 30 years; owners looking to retire there\ <br /> • 26,000 square foot lot adjacent to Ashumet Pond <br /> • Current property features a crushed stone driveway, a small parking area, a grass yard to <br /> water <br /> • Existing natural resource areas include land under water, inland bank, and priority habitat <br /> • Natural Heritage issued a `no take' letter in December <br /> • Current property lacks stormwater controls <br /> • Proposal relocates dwelling 30ft closer to street to accommodate pool in existing <br /> foundation footprint <br /> • Small shed to be relocated north of the proposed pool <br /> • Plan includes shortening driveway(removing it from the 75ft buffer zone) <br /> • Proposed stormwater management: catch basin, subsurface infiltration structures, roof <br /> dry wells <br /> • Adding a Denitrification septic system away from the pond for improved groundwater <br /> protection <br /> Mitigation & Environmental Considerations <br /> • 2,600 square feet of proposed mitigation plantings in a currently grassed area <br /> • 4 trees within 75ft buffer to increase to 2,718 square feet <br /> • Buffer plantings along north side of property line (arborvitaes, red maple,holly trees, <br /> eastern red cedar) <br /> • Proposed mitigation includes a variety of low-lying shrubs, mid-height shrubs, and trees <br /> • The remaining area will be planted with a seed mix for ground cover and slope <br /> stabilization <br /> • Current lot coverage is increasing by approximately 3 times <br /> • Pool proposed due to occasional water quality issues in Ashumet Pond <br /> Commission Concerns & Questions <br /> • Concerns about tripling of structure size while still within the 50ft buffer <br /> 7 <br />