My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/23/2025 CONSERVATION COMMISSION Minutes
>
01/23/2025 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 5:01:06 PM
Creation date
6/12/2025 4:07:54 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
01/23/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Inclusion of a sludge hammer component for enhanced treatment <br /> No commissioner or public comments <br /> Agent Comments <br /> • Replacement of standard Title V system with I/A system(sludge hammer I/A <br /> component) <br /> • No proposed increase in flow or bedrooms <br /> • Nitrogen loading calculations not provided. The staff has informed the applicant engineer <br /> to provide the Nitrogen loading calculations. It is anticipated that the Nitrogen loading <br /> will be reduced compared to the existing system <br /> • Area of disturbance is the existing lawn, which is proposed to be restored as lawn upon <br /> project completion <br /> • Recommendations: <br /> o Condition of adherence to lawn standards under Reg. 31 <br /> ➢ Board of Health: New septic construction must be in full compliance with the Board of <br /> Health I/A Septic Systems Regulation. Variances must be heard before the Board of <br /> Health. <br /> ➢ Wastewater: There is no planned connection to the Mashpee Sanitary Sewer Collection <br /> System for this location. <br /> Motion <br /> • Mr. Cook made a motion for a negative determination with the following condition: <br /> o Adherence to Regulation 31. <br /> o Mr. Sahl seconded the motion. <br /> • Roll Call: Mr. Cook(Yes), Mr. Sahl (Yes), Ms. Godfrey (Yes), Mr. Colombo (Yes) <br /> o Motion passed unanimously <br /> Documents provided: Engineering Works,Inc.; Request for Determination of Applicability;01/06/25 Plan <br /> "Proposed Septic System Upgrade Plan" <br /> A 524 Great Neck Road North, Verizon Wireless <br /> ➢ Representative: South River Environmental <br /> Project Overview <br /> • Proposed installation of a new wireless telecommunications facility with equipment <br /> within a fenced enclosure <br /> • Facility to be located approximately 50 feet from the rear of the existing Verizon-owned <br /> building in a forested area <br /> • Only 300 sgft of grading within the jurisdiction area to prepare the site for leveling <br /> • Monopole and equipment compound will be located outside the 150-foot buffer zone <br /> Environmental Considerations <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.