My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/06/2025 CONSERVATION COMMISSION Minutes
>
03/06/2025 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2025 5:00:22 PM
Creation date
6/13/2025 2:21:56 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
03/06/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Agent(Resource Areas: Land subject to coastal storm flowage; isolated; no other wetlands <br /> within 150 ft of project locus) <br /> • Revised plans submitted showing flood vent locations, abutting properties, and tree <br /> details <br /> • Revised project description submitted with waiver request from Regulation 25 (C) 7 (C) <br /> — setbacks and summary of plans revisions <br /> ➢ Board of Health: New septic construction must meet full compliance with BOH I/A <br /> septic systems regulation. Any disposal system variances shall be heard before the <br /> approving authority, the BOH <br /> ➢ Wastewater: There is no planned connection to the Mashpee Sanitary Sewer <br /> Collection System <br /> ➢ Building/ZBA: Special permit required from ZBA, scheduled March 12th <br /> Documents provided: Strong Tree Engineering.;Notice of Intent application and project narrative <br /> 02/28/2025 Plan"Proposed House Plan" (sheet 1 of 2); 01/23/2025 Plan"Notes&Details"(sheet 2 of 2) <br /> NOI <br /> 25 Wilsons Grove, Clancy Construction <br /> ➢ Representative: Strong Tree Engineering <br /> ➢ Continued from February 20, 2025 <br /> Project Overview <br /> • Similar project to 29 Wilson's Grove: raising existing dwelling and constructing new <br /> single-family dwelling <br /> • Project includes FA septic system, landscaping, and hardscaping <br /> • Both properties (25 and 29) have four-foot setbacks to shared property line <br /> • Subject property is slightly larger in lot coverage <br /> • Similar foundation conditions without cantilever section <br /> Technical Details <br /> • Different septic configuration from 23 Wilson's Grove <br /> • Slightly higher groundwater compared to 23 Wilson's Grove <br /> • Drainage strategy includes recharge basin <br /> • Same methodology for foundation with silt fence, less heavy equipment, and four-foot <br /> cross wall offset footing <br /> • Zoning hearing scheduled for next week <br /> • No variances granted yet, pending review <br /> Regulatory Concerns <br /> • Same regulation issues as neighboring property <br /> • Commissioners requested staff notification for any excavation issues <br /> • Project representative confirmed all recommendations and concerns were addressed <br /> • No extrusion or planting outside the property <br /> • Staff will conduct site inspection if issues arise, to be fixed before construction begins <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.