My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/06/2025 CONSERVATION COMMISSION Minutes
>
03/06/2025 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2025 5:00:22 PM
Creation date
6/13/2025 2:21:56 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
03/06/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
■ Planning to schedule meetings with the DCR representative to participate <br /> in focus group discussions <br /> ■ Specific property mentioned on Great Oak Road at Jehu Pond has <br /> conservation restrictions administered by DCR <br /> ■ Contact with State Fish and Wildlife regarding additional properties has <br /> been made <br /> o Tribal Coordination <br /> ■ DCR has a new tribal lease representative <br /> ■ Met with DCR representatives today <br /> ■ Discussion about scheduling a meeting with Tribal Council <br /> ■ Mr. Weeden, chair, will be discussing focus group participation with the <br /> council <br /> ■ Recent tribal election noted as factor affecting scheduling <br /> ■ Suggestion to follow up on meeting scheduling at the next meeting <br /> COMMUNICATION/CORRESPONDENCE <br /> None <br /> ADDITIONAL COMMENTS <br /> None <br /> PUBLIC HEARING <br /> RDA <br /> 86 Popponesset Island Road, Ed Shapiro <br /> ➢ Representative: Cape & Islands Engineering, Inc. <br /> ➢ Continued from February 6, 2025 <br /> Septic System Proposal <br /> • Existing system consists of two outlets: one to tank and pit, another to two pits that <br /> are in partial failure <br /> • Proposal to upgrade from 4-bedroom to 6-bedroom septic system capacity <br /> • Orenco AdvanTex nitrogen-reducing system proposed with nitrogen loading <br /> calculations provided <br /> • Current property has 6.82 ppm nitrogen loading; new system would reduce to 4.79 <br /> ppm <br /> • Board of Health granted variance for 6-bedrooms from flow control bylaw section <br /> Commission Questions & Concerns <br /> • Commissioners questioned reviewing septic application without home renovation <br /> plans <br /> • Engineer explained septic is a failed system requiring immediate repair <br /> • Commission concerned about erosion control on sloped property <br /> • Three large trees would be removed for installation <br /> • Engineer confirmed erosion control measures would be in place and monitored <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.