Laserfiche WebLink
o These measures include a thick line of silt fencing around the work area to <br /> prevent sediment runoff <br /> o Monitoring measures will occur throughout the installation process to ensure <br /> effectiveness <br /> • Discussion about whether nitrogen calculations factored in future expansion <br /> • Commissioner questioned if approval could be limited to 4-bedroom capacity <br /> Motion Discussion & Deliberation <br /> • Initial motion for a positive determination made by Commissioner Thornbrugh for a <br /> positive determination for the RDA. (No second) <br /> • Discussion about whether to issue a positive or negative determination <br /> • Clarification that the applicant would return later with full house renovation plans <br /> • Concern about the addition of 220 gallons of effluent with the expanded system <br /> • Ms. Thornbrugh revised the motion for a negative determination with conditions: <br /> o Three trees to be replaced in kind <br /> o Native ground clover mix to stabilize disturbed areas <br /> o Erosion controls to remain until stabilization is complete <br /> • Ms. Clapprood seconded the motion <br /> • Vote: Ms. Thornbrugh(Yes), Ms. Godfrey (Yes), Ms. Clapprood (Yes), Mr. Sahl <br /> (Yes), Mr. Colombo (No) <br /> o Motion passed 4:1 <br /> Agent (Resource Areas: LSCSF, buffer zone to coastal bank) <br /> • No ZBA application required. Variance request submitted for BOH review <br /> • The majority of the project scope is within previously altered areas (driveway, <br /> landscaping) <br /> • Three trees are proposed to be removed. Agent recommends 2:1 mitigation for tree <br /> removals, with six mitigation trees to be located in areas that abut the coastal bank <br /> • Nitrogen loading calculations provided and fall below the threshold of 19 ppm under <br /> Regulation 30 <br /> ➢ Board of Health: New septic construction must meet full compliance with BOH I/A <br /> septic systems regulations. Any disposal system variances shall be heard before the <br /> approving authority, the BOH <br /> ➢ Wastewater: There is no planned connection to the Mashpee Sanitary Sewer <br /> Collection System <br /> ➢ Building/ZBA: No jurisdiction <br /> Documents provided: Cape&Islands Engineering,Inc.;Request for Determination of Applicability; O1/06/25 <br /> Plan'Proposed Site Plan" <br /> RDA <br /> 12 Bay Road, Elizabeth Benway & George T. Benway III <br /> ➢ Representative: Self <br /> Foundation Replacement Project Presentation <br /> 5 <br />