My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/18/2025 PLANNING BOARD Minutes
>
06/18/2025 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2026 5:29:09 PM
Creation date
7/21/2025 12:35:28 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
06/18/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
of TMs s,s <br /> z. <br /> AU�1MLIUV��y <br /> own qf MaS 2 Panning Board <br /> c� <br /> 16 Great Weck RoadWorth <br /> -Mashpee, -Massachusetts 02649 <br /> Special Permit, and no waivers seek Plan Review. Seconded by Ms. Faulkner. All <br /> in favor. <br /> Proposed Warrant Article for Acceptance of Bike Path Layout <br /> The bike path easement is recorded and in effect, it dates to the 90's, and given the law, the <br /> Town has 99 years to adopt that easement. The Town Planner would like to have a <br /> conversation with the Town Manager's Office, it is shown on plans, we do not want to lose this <br /> opportunity. <br /> MOTION: <br /> Mr. Balzarini made a motion to submit this proposed article for Acceptance of <br /> Bike Path Layout to the Select Board for inclusion on the Warrant. Seconded by <br /> Mr. Oakley. All in favor. <br /> Proposed Warrant Article for Stormwater Management Amendment <br /> Gabrielle Belfit from Tighe & Bond is here on behalf of the Mashpee DPW. This is regarding a <br /> general permit for sewer systems, effective July 2018, with modifications added for <br /> effectiveness in January 2021. The new permit has additional enhanced requirements relating <br /> to construction and post construction and stormwater runoff. Mashpee regulations were <br /> reviewed with some suggested revisions to bring them into compliance. The July 2021 <br /> amendments omitted the construction post/construction edits to site control. <br /> In April, the EPA (Environmental Protections Agency) did an audit of Mashpee's bylaws, <br /> discussions ensued about noncompliance with the general permit, specifically those post <br /> constriction requirements. A plan was discussed for completing revisions that will go before the <br /> October Town Meeting, in order to avoid a penalty form EPA. There was no reference to <br /> redevelopments so a provision will be added to that. There was no reference to phosphorous <br /> removal, with specific water body impairments. She will provide the updated reference to the <br /> stormwater handbook as amended. The general permit has more stringent updates as well as <br /> performance standards. The redlines include specific performance standards above and <br /> beyond the Stormwater Handbook. <br /> Mr. Tobin discussed the timeline briefly and requested from Ms. Belfit or Ms. Laurent at the <br /> DPW, to format this submission into a Warrant Article, he would like a copy in the Planning <br /> Department by July 7th so it can be provided to the Town Managers Office. He would also <br /> request a representative, either herself or Ms. Laurent, at the Public Hearing for comment. <br /> Thirdly, he requests a redline version with tracks, the actual code can be copied and enable <br /> the track change feature. <br /> Ms. Waygan asked about definitions and adding one for redevelopment. The definition was <br /> read, it will remain within this section. Low impact development is listed; it needs to be defined <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.