My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/20/2025 CONSERVATION COMMISSION Minutes
>
02/20/2025 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2026 5:30:28 PM
Creation date
7/21/2025 3:22:04 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
02/20/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. Maintain and monitor all dry wells, <br /> 3. Ensure pool drainage uses pump truck <br /> 4. Submission of a signed mitigation monitoring and maintenance contract <br /> between the property owner and a certified profession for 3 years <br /> • Ms. Zollo seconded <br /> o Commissioner expressed concerns remaining with the proposal and its location <br /> being so vulnerable <br /> • Vote: Mr. Cools(Yes), Ms. Zollo (Yes), Ms. Godfrey (Yes), Ms. Clapprood (Yes), Mr. <br /> Colombo (No) Motion passes 4:1 <br /> Documents provided: JC Engineering,Inc;Notice of Intent application and project narrative; 01/13/2025 <br /> Plan"Proposed Pier&Stair Plan" <br /> N I <br /> 43-3319 27 Sturgis Lane, Darryl S. Sharpe <br /> ➢ Representative: Cape & Islands Engineering, Inc <br /> ➢ BSC letter raised legitimate issues on potential site placement; necessitated review time <br /> for applicants. Possible revisions to dock placement based on the abutter feedback needed <br /> Agent Comments <br /> • Representative requests continuance to April -1 to address abutter concerns <br /> ➢ Board of Health: No comment. <br /> ➢ Buildinll/ZBA: Stair and pump replacement requires ZBA relief. No application <br /> submitted. <br /> ➢ Wastewater: There is no planned connection to the Mashpee Sanitary Sewer Collection <br /> System. <br /> ➢ Abutters: See enclosed. <br /> Motion <br /> • Mr. Cook made a motion to approve the continuance, which Ms. Zollo seconded <br /> • Vote: Mr. Cook(Yes), Ms. Zollo (Yes), Ms. Godfrey (Yes), Mr. Sahl (Yes), Ms. <br /> Clapprood (Yes), Mr. Colombo (Yes) Motion passed unanimously <br /> Documents provided: Cape&Islands Engineering,Inc; Notice of Intent application and project narrative; <br /> 01/13/2025 Plan"Proposed Pier and Stair Plan" <br /> NOI <br /> 43-3331 23 Wilsons Grove, Clancy Construction <br /> ➢ Representative: Strong Tree Engineering. <br /> Project Overview <br /> • Project involves demolishing existing dwelling and constructing new single-family <br /> dwelling <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.