My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/20/2025 CONSERVATION COMMISSION Minutes
>
02/20/2025 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2026 5:30:28 PM
Creation date
7/21/2025 3:22:04 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
02/20/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Additional Requirements <br /> • Landscaping/lawn maintenance plan requested <br /> • Suggestion that civil engineers could handle landscape plan with simple notes <br /> • Discussion about septic system elevation details <br /> • Highest finish grade at 8.65 <br /> • Septic mounding is slight(less than a foot at property lines) <br /> • Low retaining wall included as architectural feature (top at elevation 8.5) <br /> Next Steps and Conclusion <br /> • Commission requested foundation plan methodology and waiver documentation <br /> • Alternative erosion control methods needed beyond silt fence/filter sock <br /> • Suggestion for bulkhead-type erosion control along property line during excavation <br /> • Continuance requested <br /> • Discussion about coordination between Conservation Commission and ZBA <br /> • Agent will update ZBA about hearing outcome <br /> Agent Comments <br /> • The entire lot is previously altered. No existing naturally vegetated areas <br /> • New home to be flood zone compliant <br /> • N loading calculations provided and meet the Reg 30 threshold <br /> • No landscaping details. Any proposed lawn areas must be less than 10% of lot's square <br /> footage <br /> ➢ Board of Health: New septic construction must meet full compliance with BOH I/A <br /> septic systems regulation. Any disposal system variance shall be heard before the <br /> approving authority, the BOH. <br /> ➢ Building/ZBA: Special permit required from ZBA, hearing Mar 12 <br /> ➢ Wastewater: There is no planned connection to the Mashpee Sanitary Sewer Collection <br /> System <br /> Motion <br /> • Mr. Cook made the motion to approve the continuance to March 6th which Mr. Sahl <br /> seconded. <br /> • Vote: Mr. Cook(Yes), Ms. Godfrey (Yes), Mr. Sahl(Yes), Mr. Colombo (Yes) <br /> Motion passed unanimously <br /> Documents provided: Strong Tree Engineering; Notice of Intent application and project <br /> narrative; 01/23/25 Plan "Site Plan" C-1/"Notes &Details" C-2 <br /> NOI <br /> 4 -30 0 Beach Godfrey Road, Baybury Village Home Owners Beach Association <br /> ➢ Representative: Environmental Landscape Solutions, LLC <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.