My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/20/2025 CONSERVATION COMMISSION Minutes
>
02/20/2025 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2026 5:30:28 PM
Creation date
7/21/2025 3:22:04 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
02/20/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
➢ Board of Health: New septic construction must meet full compliance with BOH FA <br /> septic systems regulation. Any disposal system variance shall be heard before the <br /> approving authority the BOH. <br /> ➢ Building/ZBA: Special permit required from ZBA, hearing Mar 12 <br /> ➢ Wastewater: There is no planned connection to the Mashpee Sanitary Sewer Collection <br /> System <br /> Motion <br /> • Mr. Cook made a motion to approve the continuance to March 61h, which Ms. Zollo <br /> seconded <br /> • Vote: Mr. Cook(Yes), Ms. Zollo (Yes), Ms. Godfrey (Yes), Mr. Sahl (Yes), Ms. <br /> Clapprood(Yes), Mr. Colombo (Yes) Motion passed unanimously <br /> Documents provided: Strong Tree Engineering;Notice of Intent application and project narrative; 01/23/25 <br /> Plan"Proposed House Plan'(I of 2); 01/23/25 Plan"Notes and Details" (2 of 2) <br /> NOI <br /> 4 -3332 25 Wilsons Grove, Clancy Construction <br /> ➢ Representative: Strong Tree Engineering. <br /> Project Overview <br /> • Replacing of an existing 1.5 story single family dwelling with a new single family <br /> dwelling <br /> • Located approximately 150 ft from beach in land subject to storm flowage <br /> • Existing leach field to be replaced with slightly larger one <br /> • Old septic tank to be replaced and relocated to southwestern area <br /> • Nitrogen counts at 11.86 mg/L(within required limits) <br /> Site Details & Concerns <br /> • Footprint increase from 1,280 sqft to new coverage <br /> • Lot coverage increasing from 37.9%to 41.9% (138 sqft increase in impervious area) <br /> • Recharge basin will be installed at north end of house <br /> • Drive will be regraded with added cobble apron <br /> • Permeable driveway and areas beneath deck and front porch <br /> • Backyard being raised to meet septic requirements <br /> • Concerns about construction impact on neighboring property at#29 <br /> Septic System Discussion <br /> • Site is being elevated and proposed as a design feature, and will be mounted <br /> • Board noted house footprint expansion is increasing lot coverage <br /> • Discussion about need for waiver request for Regulation 25 (setback requirement) <br /> • Current regulation requires 50 ft setback from land subject to coastal flow <br /> • Strong Tree agreed to prepare waiver requests for both sites <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.