My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/13/2024 ZONING BOARD OF APPEALS Decision
>
11/13/2024 ZONING BOARD OF APPEALS Decision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2026 5:21:33 PM
Creation date
7/22/2025 2:21:33 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Decision
Meeting Date
11/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> DECISION FOR A WRITTEN FINDING <br /> Owner, Stanley M. Hargus, Trustee of the <br /> Stanley M. Hargus 2004 Trust <br /> 80 Whippoorwill Circle (Map 125, Parcel 185) <br /> Mashpee, MA 02649 <br /> FINDING-2024-58 <br /> There will be flood vents installed,and a single-car garage on grade with flood vents,and a kitchen <br /> and family room addition constructed on piers. This proposed work will be approximately 640 sq. <br /> ft. and will comply with all setbacks. This project was approved by the Conservation Commission <br /> on October 24, 2024. <br /> GENERAL FINDINGS <br /> The Conservation Department comments dated October 28, 2024 were read into the record; <br /> "Resource Areas: LSCSF & Buffer zone to Salt Marsh - NOI application was approved <br /> unanimously with the condition of a two year mitigation & monitoring contract with a certified <br /> professional. With the installation of multiple drywells to control roof runoff, installation of <br /> multiple flood vents, reduction of driveway area, and conversion of driveway area to native <br /> planting beds will enhance resource areas natural function. " <br /> The Board of Health comments dated November 6, 2024 were read into the record; "House to <br /> remain 4 bedroom, I on the first floor and 3 on the second floor. " <br /> The Building Commissioner commented that the applicant consulted a flood plain specialist and <br /> followed the correct procedure with a professional engineer. <br /> a <br /> The Board discussed the height of the structure that will be raised from 11.6 ft. to 14.1 ft. The <br /> Board stated that the proposed structure should depict the height on the building plan. This will be <br /> reviewed and determined by the Building Commissioner during the building permitting process. <br /> WRITTEN FINDING CRITERIA <br /> ARTICLE V -Nonconforming Buildings and Uses: <br /> §174-17. Continuance; Extensions; Alterations - Lawfully created structures or uses may be <br /> continued, although not conforming with the provisions of this chapter. Non-conforming single- <br /> or two-family dwelling structures may be changed, extended or altered if such change, extension <br /> or alteration complies with the dimensional requirements applicable to the lot under current <br /> provisions of§174-31 or, for lots which have been developed pursuant to §174-21, complies with <br /> such requirements as were applicable to initial construction of the dwelling under provisions of <br /> §174-21. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.