My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/19/2025 SELECT BOARD Minutes
>
05/19/2025 SELECT BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 9:29:38 AM
Creation date
7/29/2025 9:29:01 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SELECT BOARD
Meeting Document Type
Minutes
Meeting Date
05/19/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Select Board <br />Minutes <br />May 19,2025 <br />Generator PM and Service to Southshore Generator <br />HVAC Services and Repair to Mechanical Air Controls <br />Line Painting to Markings INC <br />Paving and Related Work to Lawrence and Lynch Corp <br />Plumbing Services to JSP Plumbing and Heating Corp <br />Street Sweeting to Millenium Maintenance and Power Sweeping <br />MMHS Wastewater Treatment to Weston and Sampson <br />Motion seconded by Selectman Cotton. <br />Vote:5-0. Unanimous <br />Roll Call Vote <br />Selectman Weeden-yes <br />Selectwoman Wyman-Colombo-yes Selectman Cotton-yes <br />Selectwoman Kelley-Wilson-yes Selectman Richardson-yes <br />Update and Discussion of the Housing Production Plan – Brian Tobin, Town Planner <br /> The Select Board received an update on the town’s five-year Housing Production Plan <br />(HPP) from Brian Tobin, Town Planner. The HPP aims to meet the state’s 10% affordable <br />housing goal under MGL Chapter 40B. The plan includes a housing needs assessment, <br />goals, and implementation strategies, and offers “Safe Harbor” protections if the town <br />produces 0.5%–1% of its subsidized housing inventory (SHI) annually—equal to 37–74 units <br />for Mashpee. The drafting process began in 2020, with the second full draft (261 pages) <br />released on May 5, 2025, reflecting extensive public and Planning Board input. A joint <br />Planning Board and Affordable Housing Committee workshop was scheduled for May 28, <br />with final working group review by June 11, Planning Board adoption by June 18, and Select <br />Board adoption targeted for June 23, prior to state submission. The plan emphasizes water <br />quality, environmental concerns, and prioritization of affordable over market-rate units. <br />Public comment remains open through June 6, and the plan is expected to remain a “living <br />document,” updated every five years. <br />st <br />Update on Barnstable County Shared Regional Housing Services Program Funding Alternatives, 1 <br />Quarter – Brian Tobin, Town Planner <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.