My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/24/2025 CONSERVATION COMMISSION Minutes
>
04/24/2025 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2025 2:04:47 PM
Creation date
7/31/2025 2:03:55 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
04/24/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Wastewater: There is no planned connection to the Mashpee sanitary sewer collection <br />system for this property <br /> <br />Documents provided: Merrill Engineering, Inc.; Notice of Intent application and project narrative; <br />04/08/2025 Plan “Site Plan”; 04/16/2025 Plan “Plot Plan”; 04/23/2024 Architectural Plans (6 pages) <br /> <br />COC <br />0 Cooper Street, Mashpee Affordable Housing Trust (43-3091) <br /> <br /> Representative: Horsely Witten Group, INC <br /> PASSED <br /> <br />Review <br /> DOD contractor confirmed no questions or concerns, stating everything was fine and <br />passed inspection <br /> Minor deviation identified in one core water retention area where a tree well was used <br />instead of a full swale or part swale modified tree well <br /> COC determined to be in substantial compliance with the order of conditions despite the <br />minor deviation <br /> <br />Playground Project Discussion <br /> Playground installation planned directly across the street from existing buildings <br />currently under review <br /> CPC funding is being sought for the playground project, according to Ms. Godfrey's <br />Confirmation <br /> Jurisdictional concerns were raised about whether the playground would require refiling <br />if the current COC is closed out <br /> 150 ft buffer zone from storm swale behind buildings confirmed, with playground located <br />outside this area <br /> 200 ft from the river confirmed as the playground distance, placing it outside <br />jurisdictional requirements <br /> <br />Technical Tools Discussion <br /> MASS GIS mapping software recommended for jurisdictional analysis and project <br />planning <br /> ACEC layers are mentioned as a useful overlay feature for the mapping software <br /> FEMA flood zone data noted as unavailable due to direct FEMA control <br /> <br />Motion <br /> Mr. Cook made a motion to approve the COC, which Ms. Godfrey seconded <br /> Vote: Mr. Cook (Yes), Ms. Zollo (Yes), Ms. Clapprood (Yes), Ms. Godfrey (Yes), Mr. <br />Colombo (Yes) <br /> Motion passed unanimously <br /> <br />Documents provided: Horsley Witten Group; Request for Certificate of Compliance 43-3091; Recorded <br />Order of Conditions – Plan of Record <br />14 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.