Laserfiche WebLink
 As per commission feedback and comments from the previous hearing <br /> Proposed seasonal dock length of 56 linear ft <br /> Comment letter from NHESP is a “no take” of the rare species determination <br /> All dock details provided, including through-flow decking <br /> Dock details meet applicable performance standards under Regulation 27 <br /> Recommendation: <br />o Close and issue with the following condition: <br /> Submission of a signed 3-year mitigation monitoring and maintenance <br />contract between the property owner and a qualified/professional <br />(horticulturalist, wetland consultant, or restoration ecologist) <br /> <br /> <br /> Board of Health: If increase in flow, then new septic construction must meet full <br />compliance with BOH I/A septic systems regulation. Any disposal system variances <br />shall be heard before the approving authority, the BOH. <br /> <br /> Building/ZBA: Application submitted to ZBA <br /> <br /> Wastewater: There is no planned connection to the Mashpee Sanitary Sewer <br />Collection System <br /> <br />Motion <br /> Mr. Cook made a motion to close and issue with the following conditions: <br />o Add filter socks for additional erosion control <br />o A signed 3-year monitoring and maintenance contract between the homeowner <br />and a qualified professional <br />o Use of erosion mats for the embankment <br /> Ms. Godfrey seconded <br /> Vote: Mr. Cook (Yes), Ms. Clapprood (Yes), Ms. Godfrey (Yes), Mr. Sahl (Yes), Mr. <br />Colombo (Yes) <br /> Motion passed unanimously <br /> <br />Documents provided: Cape & Islands Engineering, Inc.; Notice of Intent application and project narrative; <br />03/04/2025 Plan “Proposed Pier & Stair Plan” <br /> <br />NOI <br />23 Cross Tree Way, Susan M. Brady, Trustee, Susan M. Brady 1999 Trust (43-3339) <br /> <br /> Representative: Cape & Islands Engineering, Inc <br /> <br />Overview <br /> Construction and maintenance of additions to single-family dwelling <br /> Property located within 150 ft of Popponesset Creek, salt marsh, coastal bank, and land <br />subject to coastal storm flowage, with existing dwelling build on concrete foundation at <br />roughly elevation 10 <br /> <br />9 <br /> <br /> <br />