Laserfiche WebLink
Select Board <br /> August 25,2025 <br /> Minutes <br /> Roll Call Vote <br /> Selectwoman Wyman-Colombo-yes <br /> Selectman Weeden-yes <br /> Selectman Cotton-yes <br /> Selectwoman Kelley-Wilson-yes <br /> Selectman Richardson-yes <br /> Article 4 <br /> The Select Board held a comprehensive discussion on Article 4, which proposes a $25 <br /> million appropriation to fund the construction phase of a wastewater infrastructure project <br /> in the Mashpee-Wakeby Pond watershed. This initiative is part of a larger Capita I. <br /> Improvement Plan and leverages 0%financing through the State Revolving Fund (SRF). The <br /> appropriation would allow the Town to advance the project in Fiscal Year2026, ratherthan <br /> in a later phase, in orderto take advantage of favorable funding conditions and achieve <br /> Long-term environmentalgoals. <br /> Chair Wyman-Colombo provided background on the project, including past public <br /> presentations and the availability of location maps showing the lots north of Mashpee- <br /> Wakeby Pond. She emphasized that Town staff have made efforts to betransparent and <br /> that no attempt has been madeto mislead the public. She also explained that potential <br /> sites near Waquoit Baywere considered but ultimately ruled out due to increasingly strict <br /> EPA regulations and PFAS contamination. Additionally, locating a recharge site in the <br /> Waquoit Bay area would require the clearing of significant acreage, presenting a different <br /> set of environmental trade-offs. Wyman-Colombo stressed the need to make a balanced <br /> environmental decision, acknowledging that while the alum treatment currently being <br /> used to control nutrients is helpful, it is ultimately a temporary solution, and permanent <br /> infrastructure is needed to stop pollution at its source. <br /> Board members expressed a wide range of views. Selectman Weeden remarked on the <br /> difficulty of being placed in a situation where one must choose between protecting land <br /> and protecting water. He acknowledged that both sides had donetheir research and raised <br /> valid concerns. <br /> Selectman Richardson asked aboutthe possibilityof Sandwich participating in the project, <br /> to which Wyman-Colombo responded thatwhilethere had been conversations, there is no <br /> formal commitment yet. Communication with Sandwich's engineering company is <br /> expected to begin in the winter. Richardson added thatwhile he supports protecting land, <br /> he also recognizes thatwater quality is critical, and thatthis project requires the Town to <br /> 10 <br />