Laserfiche WebLink
,�yrxrasr�.a <br /> Town of Mashpee Community Preservation Commission <br /> " 16 Great Neck Road North <br /> ° Mashpee, MA 02649 <br /> Santuit Bog Restoration and the Quashnet River Restoration projects. Mr. Hyde was also assigned to <br /> the Historic Cemeteries project, which had recently received a second allocation of funds, as well as the <br /> War Memorial Monument. <br /> For other projects: <br /> Heritage Park Upgrades (replacement of the concession shed)remained under Recreation <br /> Director oversight, though the committee noted the need for clearer communication and <br /> financial tracking. <br /> • Ashumet Pond Restoration was confirmed as Mr. Schmuhl's responsibility. <br /> • Open Space and Recreation was assigned to Ms. Waygan and Ms. MacDougall. <br /> 475 Nathan Ellis Highway was assigned to Ms. Barbee. <br /> Boys and Girls Club Basketball Courts had been postponed due to summer programming but <br /> were now visibly under construction, as Chair Russell reported seeing from social media <br /> updates.A longtime volunteer had surprised the Boys and Girls Club with a $2 million gift, <br /> allowing them to move forward on a major expansion. <br /> • LeClair Playground was also under review. <br /> • War Monument was assigned to Ms. Wyman-Colombo <br /> • Choppee Storage Barn was assigned to Mr. Klein, who reported that the project was still in <br /> negotiation with engineers. <br /> Mashpee Wakeby Boat Ramp Stormwater Project was taken by Ms. Waygan, noting that <br /> Ms. Laurent was coordinating that effort, with some state involvement and additional funding <br /> still uncertain. <br /> The Chair confirmed she would update the liaison list with these assignments and distribute it to all <br /> members. <br /> Housing Production Plan (HPP) Completion <br /> The committee discussed the status of the Housing Production Plan (HPP), which had been certified by <br /> the state. It was indicated that while the plan itself was complete, it was believed funds could not be <br /> fully closed out until town meeting formally acknowledged it. It was clarified that the state had already <br /> accepted the plan, and the final work—completed by Barrett Planning through the county's regional <br /> shared housing office—was likely already paid for. <br />