Laserfiche WebLink
Town of Mashpee Conservation Commission <br /> 16 Great Neck Road North <br /> Mashpee, MA 02649 <br /> Ms. Godfrey noted that the property currently has a two-bedroom designation but that the new septic system <br /> was being designed for three bedrooms. Mr. McEntee clarified that the Board of Health had inspected the <br /> property and determined that four rooms meet the definition of bedrooms. The previous classification had been <br /> incorrect, and the record has since been updated to reflect a four-bedroom. <br /> Concerns were raised about tree removals, as four trees were slated for removal. Mr. Kent explained that the <br /> trees were in poor health, with one in the driveway heavily damaged and others suffering from historic injury. <br /> The property owner plans to replant vegetation elsewhere once the notice of intent is approved. Ms. <br /> Thornbrugh asked about potential anchoring of septic components due to proximity to the flood zone, but Mr. <br /> McEntee provided calculations demonstrating sufficient weight and stability, indicating no anchoring was <br /> necessary. <br /> MOTION: To close an issue at 37 Riverside Road with the condition of <br /> one-year monitoring. <br /> Motion bv: Richard Sahl Seconded bv: Sandi Godfrey <br /> Vote: Motion passed by unanimous vote. <br /> (Steven Cook, Sarah Thornbrugh, Sandi Godfrey, Seana Pitt, Richard <br /> Sahl) <br /> COC 27 Aunt Janes Street, RRK Realty Holdings, LLC. Request for Certificate of Compliance 43- <br /> (Representative: BSS Designs) 2832 <br /> The commission next addressed a request for a certificate of compliance for 27 Aunt Janes Street, RRK <br /> Realty Holdings LLC, represented by BSS Design. The inspection had passed, with the only noted issue being <br /> one area of mitigation plantings. This project had been previously approved around 2019. <br /> The property owner had converted part of the lawn to wildflower seeds to replace plants that did not <br /> survive, and the new growth, primarily rudbeckias, was reported as thriving <br /> MOTION: To approve the COC for 27 Aunt Janes Street. <br /> Motion by: Sandi Godfrey Seconded bv: Richard Sahl <br /> Vote: Motion passed by unanimous vote. <br /> (Steven Cook,Sarah Thornbrugh,Sandi Godfrey,Seana Pitt,Richard Sahl) <br /> COC 252 Shore Drive, Concert New Seabury. Request for Certificate of Compliance for 43-2896 43- <br /> (Representative: BSC Group) 2896 <br /> Mr. Kent clarified that no work had been conducted on the project; even pre-construction activities had not <br /> been initiated. The commission agreed to issue the COC noting that no work had been performed, and the <br /> official form to the state will reflect this. <br /> MOTION: To approve the COC for 252 Shore Drive. <br /> Motion by: Sandi Godfrey Seconded by: Richard Sahl <br /> Discussion: Ms. Thornbrugh asked if the COC was going to note that <br /> no work — per the Order of Conditions — was done or is it being <br /> certified.Mr.Kent state that it would. The inspection from notes on the <br />