Laserfiche WebLink
Town of Mashpee Conservation Commission <br /> 16 Great Neck Road North <br /> Mashpee, MA 02649 <br /> Zone II area, consistent with groundwater protection goals. The applicant maintained that this fell under BOH <br /> jurisdiction, but the Commission agreed it also had a wetlands and groundwater nexus warranting review. <br /> System Design Review <br /> Engineers detailed the raised leach field design, with wall elevations of 10.6 feet and surrounding grades <br /> between 5.8 and 6.8 feet, creating a roughly five-foot wall height that exceeds groundwater separation <br /> requirements. Commissioners compared it to the alternate system in the second NOI and agreed the first <br /> offered slightly greater groundwater protection. <br /> Commission Discussion and Decision <br /> Some commissioners suggested delaying a vote until nitrogen offset documentation was submitted, citing <br /> the need for consistency and due diligence. Others favored conditional approval, requiring BOH verification <br /> before construction. <br /> Ultimately, the Commission approved the project with conditions, requiring submission o£ <br /> • All BOH approvals, variances, and nitrogen aggregate documents, <br /> • The location and recording information for the nitrogen offset land. <br /> Any future design changes must return to the Commission for an amended Order of Conditions. <br /> Outcome <br /> Attorney Brodsky later confirmed that the nitrogen credit land is located at Zero Leather Leaf Lane, with the <br /> nitrogen restriction and easement recorded on January 27, 2020, in the Barnstable Land Court. With these <br /> conditions and assurances on record, the Commission closed the hearing and approved the proposed I/A <br /> septic system for 5 Deans Hollow Road. <br /> MOTION: To close an issue at 5 Dean's Hollow Road with the following <br /> conditions: <br /> 1. Provide all Board of Health Approvals, variances and nitrogen <br /> aggregate documentation, including the location of the offset land, as part of <br /> the official record <br /> 2. Any future changes to the septic system design would require a return <br /> to the Commission for an amended Order of Conditions. <br /> Motion by: Richard Sahl Seconded by: Sandi Godfrey <br /> Vote: Motion passed by unanimous vote. <br /> (Steven Cook, Sarah Thornbrugh, Paul Colombo, Sandi Godfrey, Seana Pitt, <br /> Richard Sahl) <br /> NOI 5 Deans Hollow Road,John & Beth Ann Lewis & Drolet. Proposed raze of existing <br /> dwelling, construct and maintain new single-family dwelling with innovative alternative (FA) <br /> Septic system, hardscape, landscape, and mitigation plantings. <br /> (Representative: Cape & Islands Engineering, Inc.) (8.7 /9.4) (legacy Reg 25) 43- <br /> 3356 <br /> During the public hearing for the proposed redevelopment at 5 Deans Hollow Road, the applicants presented <br /> plans to demolish the existing 1950s dwelling and construct a new elevated four-bedroom single-family home <br /> 9 <br />