My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/23/2025 CONSERVATION COMMISSION Minutes
>
10/23/2025 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2026 5:22:07 PM
Creation date
11/14/2025 1:17:34 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
10/23/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Town of Mashpee Conservation Commission <br /> 16 Great Neck Road North <br /> Mashpee, MA 02649 <br /> featuring an innovative/alternative (I/A) MicroFAST septic system, new landscaping,hardscape, and stormwater <br /> management measures. <br /> The new home would be built at elevation 14.1 feet on pilings to meet FEMA flood code requirements. The <br /> proposed raised leach field would include five-foot-high retaining walls, and the I/A system would reduce nitrogen <br /> output from 15.06 ppm to 10.46 ppm, thereby improving groundwater protection despite the additional bedroom. <br /> Landscape architect Andrew Garraway detailed a mitigation plan with 2,491 square feet of native plantings, <br /> exceeding the required 2:1 mitigation ratio. The plan features Eastern red cedar, inkberry,bayberry, winterberry, <br /> highbush blueberry, and sweet fern to restore habitat and replace ornamental species. Additional features include <br /> pervious gravel driveways, dry wells and catch basins for stormwater control, and strategic grading to preserve a <br /> wildlife corridor between the septic retaining wall and abutting property. <br /> Commissioners questioned waiver requests, including one under Regulation 31.1 (limiting lawn coverage to 10% <br /> of the lot) and another for work within the 75-foot floodplain buffer. Ms. Thornburg noted the lack of a clear <br /> "compelling need"justification for increasing the dwelling's footprint in a flood zone, citing environmental ethics, <br /> cumulative impacts, and regulatory consistency. While she supported raising the home for flood compliance, she <br /> argued that expansion required stronger environmental reasoning. Attorney Adam Brodsky, representing the <br /> applicants, agreed to submit revised waiver requests addressing each criterion in Chapter 172.7(a)(3) and to provide <br /> additional documentation demonstrating public and environmental benefits. <br /> The Commission also discussed foundation design, stormwater flow, and potential floodwater channeling between <br /> the applicant's and abutter's retaining walls. The applicants agreed to adjust grading or connect the walls to prevent <br /> water funneling and clarified that the modular block walls, less than four feet high, would not require deep <br /> excavation or engineering. Commissioners requested building and foundation plans,pier layouts,wall details, and <br /> confirmation that the slab will include flood drainage openings. <br /> During public comment, abutters Paul and Katie Thurston(9 Deans Hollow Road) expressed support for the IA <br /> system but requested conditions to prevent drainage impacts, preserve privacy, and maintain stability along the <br /> shared property line. Their letter requested that existing boundary trees be preserved, a nine-foot vegetated buffer <br /> remain between retaining walls, and construction details be clarified to prevent erosion. They also recommended <br /> height limits for the retaining wall and additional evergreen screening to preserve neighborhood character. <br /> After discussion, the Commission acknowledged the project's environmental benefits, including nitrogen <br /> reduction and flood compliance, but determined that additional documentation was required before approval. The <br /> applicants must submit revised waiver requests, detailed foundation and retaining wall plans, and updated <br /> stormwater documentation addressing abutter concerns. <br /> MOTION: To continue 5 Dean's Hollow Road to November 13, 2025. <br /> Motion by: Sarah Thornbrugh Seconded by: Richard Sahl <br /> Vote: Motion passed by unanimous vote. <br /> (Steven Cook, Sarah Thornbrugh, Paul Colombo, Sandi Godfrey, <br /> Seana Pitt, Richard Sahl) <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.