My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/13/2025 CONSERVATION COMMISSION Minutes (2)
>
11/13/2025 CONSERVATION COMMISSION Minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2026 5:19:34 PM
Creation date
11/24/2025 4:07:56 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
11/13/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Town of Mashpee Conservation Commission <br /> 16 Great Neck Road North <br /> Mashpee, MA 02649 <br /> Commissioner Questions <br /> Helical Piles and Soil Borings <br /> Mr. Sahl asked whether switching to helical piles eliminated the need for soil borings. Ms. Raddatz clarified <br /> that the boring program remains unchanged; the piles replace the previously proposed footings but borings will <br /> still be conducted using a tracked rig. <br /> Paver Path Porosity <br /> Ms. Godfrey asked whether the new paver path would be permeable. <br /> Ms. Raddatz stated that permeable pavers were intended, and Megan Brady of SA Design confirmed they <br /> would indeed be permeable. Ms. Godfrey requested this be explicitly shown on the plans; Ms. Raddatz agreed. <br /> Plan Set Consistency <br /> Chair Cook thanked the team for addressing prior concerns—particularly replacing concrete footings with <br /> helical piles. He observed that the architectural plan set in the Commission packet still displayed traditional <br /> footings. Ms. Raddatz confirmed that the packet contained an outdated version; the full set submitted to <br /> Conservation includes updated cross-sections showing helical piles. <br /> Pile Installation Equipment and Under-Deck Conditions <br /> Chair Cook asked about the installation equipment for the 120 helical piles. Ms. Raddatz stated that a tracked <br /> machine similar in size(or slightly larger) than the boring rig would likely be used, operating from the <br /> demolition area. <br /> He also asked about conditions beneath the new deck. Ms. Raddatz explained that after pile installation, sand <br /> will be backfilled to previous elevation and will remain exposed under the deck, allowing dune processes <br /> windblown sand transport and natural movement—to continue. <br /> Before voting, Mr. McManus recommended that any approval include three years of mitigation monitoring. <br /> Chair Cook agreed and confirmed that the paver path must be clearly labeled as permeable on the final plans. <br /> MOTION: To close an issue at 252 Shore Drive with the following conditions: <br /> 1. Three-year mitigation monitoring; <br /> 2. Permeable pavers reflected on revised plan; and <br /> 3. Standard construction and restoration conditions. <br /> Motion by: Richard Sahl Seconded by: Sandi Godfrey <br /> Vote: Motion passed by unanimous vote. <br /> (Steven Cook, Paul Colombo, Sandi Godfrey, Richard Sahl) <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.