My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/13/2025 CONSERVATION COMMISSION Minutes (2)
>
11/13/2025 CONSERVATION COMMISSION Minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2026 5:19:34 PM
Creation date
11/24/2025 4:07:56 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
11/13/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br /> Town of Mashpee Conservation Commission <br /> 16 Great Neck Road North <br /> Mashpee, MA 02649 <br /> Motion by: Richard Sahl Seconded by: Sandi Godfrey <br /> Discussion: Rear additions must be filed under a NOI once the septic <br /> tank is located. <br /> Vote: Motion passed by unanimous vote. <br /> (Steven Cook, Paul Colombo, Sandi Godfrey, Richard Sahl) <br /> NOI 367 Mashpee Neck Road, Gary & Linda Oldham. Proposed Raze & Rebuild single-family <br /> dwelling with town sewer connection. (Representative: Cape & Islands Engineering.) <br /> (cont. 10.23) 43- <br /> 3372 <br /> Mr. Dibb provided an overview of the site's resource areas and topography: <br /> • The property lies between Shoestring Bay(to the east) and Mashpee Neck Road. <br /> • A salt marsh exists between the shoreline and the bay. <br /> • A drainage swale lies between the salt marsh and the roadway. <br /> • A coastal bank is present, defined through slope and flood characteristics. <br /> • Two flood zone boundaries cross the lot: <br /> o The limit of the coastal A zone (V-zone to AE transition). <br /> o The AE-I Ito Zone X boundary, which runs just east of the existing home. <br /> The project proposes to demolish the existing house and rebuild on a new, flood-compliant foundation. A new <br /> modular home is planned, along with a separate garage positioned to the left of the dwelling. <br /> Proposed Development and Buffer Zone Impacts <br /> The new foundation measures 42 ft x 27.5 ft, with a new detached garage also planned. <br /> Two overlapping 75-ft buffer zones apply: <br /> • 75-ft buffer to the salt marsh <br /> • 75-ft buffer to the coastal bank <br /> Mr. Dibb described how the mitigation table was developed: <br /> • The coastal bank buffer area serves as the primary regulatory buffer. <br /> • The site plan breaks development into 5-ft and 10-ft bands to calculate existing vs. proposed <br /> disturbance. <br /> • The proposal increases development within the 75-ft buffer by 151 sq. ft, requiring mitigation. <br /> • The plans provide nearly 500 sq. ft of mitigation—more than triple what is required. <br /> Regarding landscaping: <br /> • Detailed plant labels are not shown, but areas are clearly categorized as grassed, landscaped, or natural. <br /> • Dark green shading identifies mitigation zones. <br /> • Five replacement trees are proposed. <br /> • Nitrogen loading calculations were submitted. <br /> Sewer Connection and Nitrogen Loading <br /> Mr. Dibb explained that the Board of Health had indicated the existing leach pit may continue to be used until <br /> sewer becomes available. Nitrogen calculations were prepared assuming sewer connection, resulting in near- <br /> zero projected nitrogen loading. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.