My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/17/2025 SEWER COMMISSION Minutes (2)
>
07/17/2025 SEWER COMMISSION Minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2026 5:29:04 PM
Creation date
12/16/2025 3:16:53 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
07/17/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Town of Mashpee Sewer Commission <br /> t <br /> 16 Great Neck Road North <br /> Mashpee, MA 02649 <br /> Surveyor Confusion and Property Concerns <br /> Mr. Meader addressed concerns raised by residents about unexpected surveyors showing up on private <br /> property: <br /> • The surveyors began work early, prior to formal notice, because GHD instructed them to <br /> prepare to move quickly once the green light was given. <br /> • Although the firm's intent was helpful,the public was not informed, which led to surprise and <br /> confusion. <br /> • The town has since implemented a new requirement: <br /> o Surveyors must leave written notice (e.g., door hangers) even if they do not speak <br /> directly with the homeowner. <br /> Chair Harris appreciated the corrective follow-up now underway. <br /> Public Communications and Design Renderings <br /> Mr. Meader confirmed that, following the Select Board's recent approval,the town is now authorized <br /> to: <br /> • Initiate formal public outreach regarding the satellite treatment facility and associated design <br /> proposals. <br /> • Begin preparing artist's renderings of proposed infrastructure and landscapes. <br /> Chair Harris asked for clarification on how much detail is available in current design documents, and <br /> whether these could be shared with the public. Mr. Drainville responded: <br /> • Technical design plans are typically too complex for public understanding so, instead, GHD will <br /> produce visual renderings (images, diagrams, and illustrations) suitable for public review. <br /> o These will depict structures, piping(above/below grade), landscaping, and building <br /> footprints. <br /> • Similar visual aids were produced for the Phase 1 treatment facility, including pump stations and <br /> landscaping, and will be prepared again for this phase. <br /> Funding Timeline and SRF Requirements <br /> • The town is attempting to complete all necessary documentation and approvals to secure SRF <br /> funding for 2026. <br /> It was noted that: <br /> • The federal government has proposed a 90%cut to SRF funding in the next fiscal year. <br /> • Therefore, securing funding this year is crucial, as future availability is highly uncertain. <br /> • Both the Mashpee-Wakeby cluster system and Phase 2 of the sewering project are currently <br /> guaranteed funding if deadlines are met. <br /> Failure to meet SRF deadlines would result in: <br /> • Loss of 25% loan forgiveness <br /> • Increased interest rates <br /> • Loss of access to favorable state support <br /> The town is working diligently to meet these milestones and secure optimal funding for residents. <br />
The URL can be used to link to this page
Your browser does not support the video tag.