My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/20/2025 BOARD OF HEALTH Minutes
>
08/20/2025 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2026 5:28:35 PM
Creation date
12/17/2025 9:23:31 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
08/20/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Tobin of Aa!gbpee <br /> u <br /> BOARDF HEALTH <br /> all 16 GREAT NECK ROADNORTH <br /> MASHPEE, MASSACHUSETTS 02649 " <br /> (508) 539-1426" Fax (508)477-0496 <br /> PubficHeAdth <br /> Board Of Health — Public �p"d�w2�d"� �u�",�axad.. p,""ee4�. <br /> Wednesday, August 20 2025 <br /> Waquoit <br /> Boarders resent: Absentee Members: Additional es; <br /> Ernest Virilio,Chair Zackary Seabury, Health Agent <br /> John Livingston,Vice Chair <br /> Dennis Ring,Clerk <br /> MEETINGCALL <br /> 4:30 Mr. Vir ilia, called the meeting to order. <br /> BUSINESSOLD <br /> 1. Review of request for variance -- 368 MonomoscoyMain Street Development <br /> Owners hired"Builder A"to build their home.The septic system was installed by"Builder A".Owners made <br /> a change in contractor on the project & "Builder A" has been non-responsive and will not complete the <br /> Certified Installer Form for the new septic system. Main Street Development (replacement builder) is <br /> requesting to take full responsibility for new septic system. Additionally, the new septic system has been <br /> fully inspected&passed by BOH and the engineer of record. <br /> r. Seabury stated for Title 5 to receive the COC you have to have your certified <br /> engineer's As Built and the sign off from the installer saying that they installed it as per <br /> Ian, We have tried reach the installer, Dom. They have tried to reach the installer, <br /> e ails written, phone calls placed and letters written withno response. Ha hasn't done <br /> any other systems in town since this so, 're just looking for a variance for us to issue <br /> the COC withtheir As Built and their sign-off sign-off awe've done our inspections. We see <br /> that the pump system works, goes to the - o . The D-Box drains properly. This is the <br /> first time I've experienced needingtot the come before the board fort is. But, I had a <br /> feeling with the same contractor company, not the installer, but the builder of this <br /> house with another installer, we're going to have this problem come up in the very near <br /> future. I think we need to seta precedent that, if we can't get a hold of them, we will <br /> allow another engineer certification our inspection o suffice to not hold up people <br /> from having their Certificate of Completion for their house. This has been going on for <br /> a long time. It's expired actually. <br /> r. Vir ilia stated that we need to revoke the installer's license and he is ok withi . <br />
The URL can be used to link to this page
Your browser does not support the video tag.