Laserfiche WebLink
<br />Select Board <br />December 8,2025 <br />Minutes <br /> <br />The Select Board was informed of a stormwater improvement project planned for the parking <br />lot at the boat ramp, to be undertaken in partnership with the APCC and the state. The project <br />is supported by a $250,000 grant, along with $350,000 approved at Town Meeting through <br />the Community Preservation Act. In addition, the APCC has committed to providing private <br />funding of up to $265,000, and the state has committed funding of up to $400,000. The <br />project is currently out to bid, and with the state’s funding commitment in place, the Town <br />will oversee the implementation and management of the project. <br />Motion made by Selectman Richardson to approve the proposed contract with MA <br />O?ice of Fishing & Boating Access for the stormwater retrofit project at Mashpee- <br />Wakeby boat ramp. <br />Motion seconded by Selectman Weeden. <br />Vote: 5-0 Unanimous <br />Roll Call Vote <br />Selectwoman Wyman-Colombo-yes <br />Selectman Weeden-yes <br />Selectman Cotton-yes <br />Selectwoman Kelley-Wilson-yes <br />Selectman Richardson- yes <br /> <br />Presentation of Proposed Stormwater Improvements to Attaquin Park <br />DPW Director Catherine Laurent explained that the project was identified through the Town’s <br />Stormwater Asset Management Plan. The project aligns with the Town’s ongoing wastewater <br />improvements planned as part of Phase II, making this a logical continuation of existing <br />infrastructure e?orts. <br /> <br />The proposed design includes stormwater treatment through infiltration basins and <br />bioretention areas beneath and adjacent to the existing asphalt, with overflow directed to <br />9 <br /> <br /> <br />